Fuzzy Distributed Hybrid Flow Shop Scheduling Problem With Heterogeneous Factory and Unrelated Parallel Machine: A Shuffled Frog Leaping Algorithm With Collaboration of Multiple Search Strategies
The single factory production is shifting to multi-factory production which brings new challenges. Hybrid flow shop problem (HFSP) as a common problem in production-manufacturing has been studied extensively, however distributed hybrid flow shop problem (DHFSP) has not been paying sufficient attenti...
Main Authors: | Lei Wang, Dongdong Li |
---|---|
Format: | Article |
Language: | English |
Published: |
IEEE
2020-01-01
|
Series: | IEEE Access |
Subjects: | |
Online Access: | https://ieeexplore.ieee.org/document/9273064/ |
Similar Items
-
A Novel Shuffled Frog-Leaping Algorithm for Unrelated Parallel Machine Scheduling with Deteriorating Maintenance and Setup Time
by: Deming Lei, et al.
Published: (2021-08-01) -
An Improved Shuffled Frog-Leaping Algorithm for Flexible Job Shop Scheduling Problem
by: Kong Lu, et al.
Published: (2015-02-01) -
Shuffled Frog-Leaping Programming for Solving Regression Problems
by: M. Abdollahi, et al.
Published: (2020-07-01) -
Solving Energy-Aware Real-Time Tasks Scheduling Problem with Shuffled Frog Leaping Algorithm on Heterogeneous Platforms
by: Weizhe Zhang, et al.
Published: (2015-06-01) -
Genetic and Improved Shuffled Frog Leaping Algorithms for a 2-Stage Model of a Hub Covering Location Network
by: M. Mohammadi, et al.
Published: (2011-09-01)