Identification and Assessment of Subway Construction Risk: An Integration of AHP and Experts Grading Method
Qing Dao is one of the earliest cities that included the idea of subway construction into the city’s transportation plan. However, the construction period of a subway project is long, and the uncertainties caused by the geological conditions and surrounding environments are huge, thus a risk assessm...
Main Authors: | Junyan Liu, Zijian Du, Lixing Ma, Chao Liu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/6661099 |
Similar Items
-
FANPCE technique for risk assessment on subway station construction
by: Luyuan Wu, et al.
Published: (2019-06-01) -
AHP and FAHP Based Expert Systems for Risk Assessment of Construction Safety of Airport Runways
by: TSAI,YI-CHE, et al.
Published: (2017) -
An AHP and FAHP based Expert System for Risk Assessment of Construction Engineering of Factory Buildings for High Technology
by: Cheng-Feng Chen, et al.
Published: (2015) -
Evaluation of Waterlogging Risk in an Urban Subway Station
by: Haiying Yu, et al.
Published: (2019-01-01) -
Identification of Inelastic Subway Trips Based on Weekly Station Sequence Data: An Example from the Beijing Subway
by: Hainan Huang, et al.
Published: (2018-12-01)