Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)

Nowadays, PTT Public Company Limited has six gas separation plants (GSP). These GSPs consume both fuel gases (using hot oil as heating media) and electricity for use in the process. This work is focused on GSP5. The energy audit or monitoring program will be applied to GSP5 to monitor and report ene...

Full description

Bibliographic Details
Main Authors: P. Yongkasemkul, K. Siemanond, N. Nivartvong, Y. Chaleoysamai, R. Chuvaree
Format: Article
Language:English
Published: AIDIC Servizi S.r.l. 2012-09-01
Series:Chemical Engineering Transactions
Online Access:https://www.cetjournal.it/index.php/cet/article/view/7153
id doaj-4cc5b868f1134e08928677588154a2fb
record_format Article
spelling doaj-4cc5b868f1134e08928677588154a2fb2021-02-22T21:03:33ZengAIDIC Servizi S.r.l.Chemical Engineering Transactions2283-92162012-09-012910.3303/CET1229157Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)P. YongkasemkulK. SiemanondN. NivartvongY. ChaleoysamaiR. ChuvareeNowadays, PTT Public Company Limited has six gas separation plants (GSP). These GSPs consume both fuel gases (using hot oil as heating media) and electricity for use in the process. This work is focused on GSP5. The energy audit or monitoring program will be applied to GSP5 to monitor and report energy usage in each area of GSP5 and identifies where energy is lost from the process. However measured data from energy audit may contain random and gross errors. Technique called “Data reconciliation with gross error detection” will be applied to reduce effect of error and improve accuracy of measured data. In this project the measured data from hot oil heat exchangers network of seventeen exchangers in GSP5 are reconciled simultaneously by using mass and energy balance as constraints. Constraints from energy balance were nonlinear equation and program General Algebraic Modeling System (GAMS) was used to solve nonlinear system. Data reconciliation, Gross error detection and gross error elimination used least-squares method, Global test and Measurement test respectively. The goal of this project is to develop the energy audit program and data reconciliation with gross error detection technique to improve the performance of GSP5. Program will monitor and report the energy usage and energy loss with more accuracy to improve energy usage in the plant.https://www.cetjournal.it/index.php/cet/article/view/7153
collection DOAJ
language English
format Article
sources DOAJ
author P. Yongkasemkul
K. Siemanond
N. Nivartvong
Y. Chaleoysamai
R. Chuvaree
spellingShingle P. Yongkasemkul
K. Siemanond
N. Nivartvong
Y. Chaleoysamai
R. Chuvaree
Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)
Chemical Engineering Transactions
author_facet P. Yongkasemkul
K. Siemanond
N. Nivartvong
Y. Chaleoysamai
R. Chuvaree
author_sort P. Yongkasemkul
title Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)
title_short Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)
title_full Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)
title_fullStr Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)
title_full_unstemmed Data Reconciliation and Energy Audits for PTT Gas Separation Plant No.5 (GSP5)
title_sort data reconciliation and energy audits for ptt gas separation plant no.5 (gsp5)
publisher AIDIC Servizi S.r.l.
series Chemical Engineering Transactions
issn 2283-9216
publishDate 2012-09-01
description Nowadays, PTT Public Company Limited has six gas separation plants (GSP). These GSPs consume both fuel gases (using hot oil as heating media) and electricity for use in the process. This work is focused on GSP5. The energy audit or monitoring program will be applied to GSP5 to monitor and report energy usage in each area of GSP5 and identifies where energy is lost from the process. However measured data from energy audit may contain random and gross errors. Technique called “Data reconciliation with gross error detection” will be applied to reduce effect of error and improve accuracy of measured data. In this project the measured data from hot oil heat exchangers network of seventeen exchangers in GSP5 are reconciled simultaneously by using mass and energy balance as constraints. Constraints from energy balance were nonlinear equation and program General Algebraic Modeling System (GAMS) was used to solve nonlinear system. Data reconciliation, Gross error detection and gross error elimination used least-squares method, Global test and Measurement test respectively. The goal of this project is to develop the energy audit program and data reconciliation with gross error detection technique to improve the performance of GSP5. Program will monitor and report the energy usage and energy loss with more accuracy to improve energy usage in the plant.
url https://www.cetjournal.it/index.php/cet/article/view/7153
work_keys_str_mv AT pyongkasemkul datareconciliationandenergyauditsforpttgasseparationplantno5gsp5
AT ksiemanond datareconciliationandenergyauditsforpttgasseparationplantno5gsp5
AT nnivartvong datareconciliationandenergyauditsforpttgasseparationplantno5gsp5
AT ychaleoysamai datareconciliationandenergyauditsforpttgasseparationplantno5gsp5
AT rchuvaree datareconciliationandenergyauditsforpttgasseparationplantno5gsp5
_version_ 1724256254970298368