Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass

To investigate the instability of two neighborhood tunnels with large crossing section during the construction, the Tushan subway station was taken as study background, which was built in steeply jointed rock mass. Based on the excavation method called traditional double side drift, numerical simula...

Full description

Bibliographic Details
Main Authors: Aichen Zheng, Feng Huang, Zhengdong Tang, Zhaoyi He
Format: Article
Language:English
Published: Hindawi Limited 2020-01-01
Series:Mathematical Problems in Engineering
Online Access:http://dx.doi.org/10.1155/2020/9641291
id doaj-507ae421e75a4bfdadcf5b8188cc03d2
record_format Article
spelling doaj-507ae421e75a4bfdadcf5b8188cc03d22020-11-25T03:56:26ZengHindawi LimitedMathematical Problems in Engineering1024-123X1563-51472020-01-01202010.1155/2020/96412919641291Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock MassAichen Zheng0Feng Huang1Zhengdong Tang2Zhaoyi He3School of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaSchool of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaSchool of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaSchool of Civil Engineering, Chongqing Jiaotong University, Chongqing 400074, ChinaTo investigate the instability of two neighborhood tunnels with large crossing section during the construction, the Tushan subway station was taken as study background, which was built in steeply jointed rock mass. Based on the excavation method called traditional double side drift, numerical simulations of four different face excavation sequences in the two neighborhood tunnels were conducted to optimize construction sequence to improve the stability during tunneling. The results show that first excavation of the right tunnel produced less deformation of the tunnels due to joints dip. The effects of rock mass discontinuities on the stability of the tunnels were studied through comparison between the real condition with joints and the assumed condition without joints. Furthermore, six initial supporting systems with different parameters were compared, and the field observations of deformations along tunnel profile show good agreement with the numerical results. Based on the numerical simulation, the length of rock anchors could be designed asymmetrically, which is more economical than the symmetrical design. The optimized thickness of shot concrete and spacing of steel sets was 35 cm and 60 cm, respectively.http://dx.doi.org/10.1155/2020/9641291
collection DOAJ
language English
format Article
sources DOAJ
author Aichen Zheng
Feng Huang
Zhengdong Tang
Zhaoyi He
spellingShingle Aichen Zheng
Feng Huang
Zhengdong Tang
Zhaoyi He
Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass
Mathematical Problems in Engineering
author_facet Aichen Zheng
Feng Huang
Zhengdong Tang
Zhaoyi He
author_sort Aichen Zheng
title Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass
title_short Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass
title_full Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass
title_fullStr Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass
title_full_unstemmed Stability Analysis of Neighborhood Tunnels with Large Section Constructed in Steeply Jointed Rock Mass
title_sort stability analysis of neighborhood tunnels with large section constructed in steeply jointed rock mass
publisher Hindawi Limited
series Mathematical Problems in Engineering
issn 1024-123X
1563-5147
publishDate 2020-01-01
description To investigate the instability of two neighborhood tunnels with large crossing section during the construction, the Tushan subway station was taken as study background, which was built in steeply jointed rock mass. Based on the excavation method called traditional double side drift, numerical simulations of four different face excavation sequences in the two neighborhood tunnels were conducted to optimize construction sequence to improve the stability during tunneling. The results show that first excavation of the right tunnel produced less deformation of the tunnels due to joints dip. The effects of rock mass discontinuities on the stability of the tunnels were studied through comparison between the real condition with joints and the assumed condition without joints. Furthermore, six initial supporting systems with different parameters were compared, and the field observations of deformations along tunnel profile show good agreement with the numerical results. Based on the numerical simulation, the length of rock anchors could be designed asymmetrically, which is more economical than the symmetrical design. The optimized thickness of shot concrete and spacing of steel sets was 35 cm and 60 cm, respectively.
url http://dx.doi.org/10.1155/2020/9641291
work_keys_str_mv AT aichenzheng stabilityanalysisofneighborhoodtunnelswithlargesectionconstructedinsteeplyjointedrockmass
AT fenghuang stabilityanalysisofneighborhoodtunnelswithlargesectionconstructedinsteeplyjointedrockmass
AT zhengdongtang stabilityanalysisofneighborhoodtunnelswithlargesectionconstructedinsteeplyjointedrockmass
AT zhaoyihe stabilityanalysisofneighborhoodtunnelswithlargesectionconstructedinsteeplyjointedrockmass
_version_ 1715082250650910720