MULTI OBJECTIVE MODEL FOR BALANCING U-TYPE ASSEMBLY LINE WITH PERMANENT AND TEMPORARY WORKERS
Assembly line balancing is one of the most important management decisions for reducing production costs. So far, many researches have been done in this area. In this research, we expand the U-type line-balancing using goal programming for multi objective model with two goals, i.e., minimized the num...
Main Author: | Gede Agus Widyadana |
---|---|
Format: | Article |
Language: | English |
Published: |
Petra Christian University
2009-01-01
|
Series: | Jurnal Teknik Industri |
Subjects: | |
Online Access: | http://puslit2.petra.ac.id/ejournal/index.php/ind/article/view/17099 |
Similar Items
-
Robust optimization for U-shaped assembly line worker assignment and balancing problem with uncertain task times
by: Ömer Faruk Yılmaz
Published: (2020-01-01) -
Psychological Safety, Job Crafting, and Employability: A Comparison Between Permanent and Temporary Workers
by: Judith Plomp, et al.
Published: (2019-05-01) -
Multi-objective linear mathematical programming for solving U-shaped robotic assembly line balancing
by: M. Rabbani, et al.
Published: (2019-04-01) -
‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
by: Masoud Rabbani, et al.
Published: (2016-03-01) -
KESEIMBANGAN LINTASAN TIPE U- LINE ASSEMBLY PADA PERAKITAN POMPA AIR
by: Pratikto Pratikto, et al.
Published: (2009-01-01)