Flexible Job Shop Scheduling Problem Using an Improved Ant Colony Optimization

As an extension of the classical job shop scheduling problem, the flexible job shop scheduling problem (FJSP) plays an important role in real production systems. In FJSP, an operation is allowed to be processed on more than one alternative machine. It has been proven to be a strongly NP-hard problem...

Full description

Bibliographic Details
Main Authors: Lei Wang, Jingcao Cai, Ming Li, Zhihu Liu
Format: Article
Language:English
Published: Hindawi Limited 2017-01-01
Series:Scientific Programming
Online Access:http://dx.doi.org/10.1155/2017/9016303
Description
Summary:As an extension of the classical job shop scheduling problem, the flexible job shop scheduling problem (FJSP) plays an important role in real production systems. In FJSP, an operation is allowed to be processed on more than one alternative machine. It has been proven to be a strongly NP-hard problem. Ant colony optimization (ACO) has been proven to be an efficient approach for dealing with FJSP. However, the basic ACO has two main disadvantages including low computational efficiency and local optimum. In order to overcome these two disadvantages, an improved ant colony optimization (IACO) is proposed to optimize the makespan for FJSP. The following aspects are done on our improved ant colony optimization algorithm: select machine rule problems, initialize uniform distributed mechanism for ants, change pheromone’s guiding mechanism, select node method, and update pheromone’s mechanism. An actual production instance and two sets of well-known benchmark instances are tested and comparisons with some other approaches verify the effectiveness of the proposed IACO. The results reveal that our proposed IACO can provide better solution in a reasonable computational time.
ISSN:1058-9244
1875-919X