EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS

Subject: the article proposes the methods for flexible regulation of administrative and organizational-technical relations between participants of the construction process which are based on integrated management contracts to address the issues related to realization of investment-construction proje...

Full description

Bibliographic Details
Main Authors: Sborshchikov Sergey Borisovich, Shinkareva Galina Nikolaevna, Maslova Lyubov’ Alexandrovna, Leybman Dmitriy Mikhailovich
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU) 2017-11-01
Series:Vestnik MGSU
Subjects:
Online Access:http://vestnikmgsu.ru/index.php/archive/article/download/4103
id doaj-5354de843d60484ea8ec184e6e103a7d
record_format Article
spelling doaj-5354de843d60484ea8ec184e6e103a7d2020-11-25T00:48:40ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU 1997-09352017-11-01111240124710.22227/1997-0935.2017.11.1240-1247EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORSSborshchikov Sergey Borisovich0Shinkareva Galina Nikolaevna1Maslova Lyubov’ Alexandrovna2Leybman Dmitriy Mikhailovich3Moscow State University of Civil Engineering (National Research University) (MGSU)Moscow State University of Civil Engineering (National Research University) (MGSU)Moscow State University of Civil Engineering (National Research University) (MGSU)Moscow State University of Civil Engineering (National Research University) (MGSU)Subject: the article proposes the methods for flexible regulation of administrative and organizational-technical relations between participants of the construction process which are based on integrated management contracts to address the issues related to realization of investment-construction projects in due time and within the funding limit under the influence of random factors. Research objectives: development of a conceptual simulation model of the process of making managerial decisions within the framework of realization of investment-construction project taking into account uncertainty. Materials and methods: We used the principles of the theory of control of technical and manufacturing systems, cybernetics, and also the methods of organizational, logical-semantic and simulation modeling, the works of domestic and foreign scholars on the problem under study. Results: by creating a functional simulation model for realization of investment-construction project, the construction process is considered as an iterative activity that is characterized by a list of indicators describing the state of the project at each control point. Controlled parameters include: planned indicators of the start and end date, and also the cost of execution of works depending on the project realization option (nomenclature of works, material and technical resources, labor intensity, machine capacity). Also, we characterize the basic criteria for efficiency of managerial influence on the realization of construction projects. Conclusions: we substantiated the necessity of taking into account the influence of random factors in the process of realization of investment-construction projects to determine more accurate predictive estimates of cost and duration of construction, especially for objects financed at the expense of state funds and built on the “fixed” contract price.http://vestnikmgsu.ru/index.php/archive/article/download/4103investment-construction projectmanagerial influencerandom factorssimulation modelproject managementintegrated (complex) contractsconstruction managerengineering“quality loop”
collection DOAJ
language English
format Article
sources DOAJ
author Sborshchikov Sergey Borisovich
Shinkareva Galina Nikolaevna
Maslova Lyubov’ Alexandrovna
Leybman Dmitriy Mikhailovich
spellingShingle Sborshchikov Sergey Borisovich
Shinkareva Galina Nikolaevna
Maslova Lyubov’ Alexandrovna
Leybman Dmitriy Mikhailovich
EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
Vestnik MGSU
investment-construction project
managerial influence
random factors
simulation model
project management
integrated (complex) contracts
construction manager
engineering
“quality loop”
author_facet Sborshchikov Sergey Borisovich
Shinkareva Galina Nikolaevna
Maslova Lyubov’ Alexandrovna
Leybman Dmitriy Mikhailovich
author_sort Sborshchikov Sergey Borisovich
title EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
title_short EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
title_full EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
title_fullStr EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
title_full_unstemmed EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
title_sort evaluation of effectiveness of managing construction project realization under the influence of random factors
publisher Moscow State University of Civil Engineering (MGSU)
series Vestnik MGSU
issn 1997-0935
publishDate 2017-11-01
description Subject: the article proposes the methods for flexible regulation of administrative and organizational-technical relations between participants of the construction process which are based on integrated management contracts to address the issues related to realization of investment-construction projects in due time and within the funding limit under the influence of random factors. Research objectives: development of a conceptual simulation model of the process of making managerial decisions within the framework of realization of investment-construction project taking into account uncertainty. Materials and methods: We used the principles of the theory of control of technical and manufacturing systems, cybernetics, and also the methods of organizational, logical-semantic and simulation modeling, the works of domestic and foreign scholars on the problem under study. Results: by creating a functional simulation model for realization of investment-construction project, the construction process is considered as an iterative activity that is characterized by a list of indicators describing the state of the project at each control point. Controlled parameters include: planned indicators of the start and end date, and also the cost of execution of works depending on the project realization option (nomenclature of works, material and technical resources, labor intensity, machine capacity). Also, we characterize the basic criteria for efficiency of managerial influence on the realization of construction projects. Conclusions: we substantiated the necessity of taking into account the influence of random factors in the process of realization of investment-construction projects to determine more accurate predictive estimates of cost and duration of construction, especially for objects financed at the expense of state funds and built on the “fixed” contract price.
topic investment-construction project
managerial influence
random factors
simulation model
project management
integrated (complex) contracts
construction manager
engineering
“quality loop”
url http://vestnikmgsu.ru/index.php/archive/article/download/4103
work_keys_str_mv AT sborshchikovsergeyborisovich evaluationofeffectivenessofmanagingconstructionprojectrealizationundertheinfluenceofrandomfactors
AT shinkarevagalinanikolaevna evaluationofeffectivenessofmanagingconstructionprojectrealizationundertheinfluenceofrandomfactors
AT maslovalyubovalexandrovna evaluationofeffectivenessofmanagingconstructionprojectrealizationundertheinfluenceofrandomfactors
AT leybmandmitriymikhailovich evaluationofeffectivenessofmanagingconstructionprojectrealizationundertheinfluenceofrandomfactors
_version_ 1725255063423680512