EVALUATION OF EFFECTIVENESS OF MANAGING CONSTRUCTION PROJECT REALIZATION UNDER THE INFLUENCE OF RANDOM FACTORS
Subject: the article proposes the methods for flexible regulation of administrative and organizational-technical relations between participants of the construction process which are based on integrated management contracts to address the issues related to realization of investment-construction proje...
Main Authors: | Sborshchikov Sergey Borisovich, Shinkareva Galina Nikolaevna, Maslova Lyubov’ Alexandrovna, Leybman Dmitriy Mikhailovich |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2017-11-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | http://vestnikmgsu.ru/index.php/archive/article/download/4103 |
Similar Items
-
Formalized description of strategic control system functioning
by: Sborshchikov Sergey Borisovich, et al.
Published: (2016-10-01) -
THE IMPACT OF PREPARATION OF INITIAL PERMISSIVE DOCUMENTATION ON THE DURATION FOR REALIZATION OF INVESTMENT-CONSTRUCTION PROJECTS
Published: (2019-02-01) -
THE IMPACT OF PREPARATION OF INITIAL PERMISSIVE DOCUMENTATION ON THE DURATION FOR REALIZATION OF INVESTMENT-CONSTRUCTION PROJECTS
Published: (2016-12-01) -
An Integrated Model for Auditing Construction Projects - a Case Study of Oil and Gas Projects in Iran
by: Teymouri, Ahmad
Published: (2015) -
Construction project management through building contracts, a South African perspective
by: Hendri du Plessis, et al.
Published: (2018-06-01)