An Approach for Integrated Analysis of Human Factors in Remote Handling Maintenance
Considering dangerous environmental conditions, maintenance of radioactive equipment can be performed by remote handling maintenance (RHM) system. The RHM system is a sophisticated man-machine system. Therefore, human factors analysis is an inevitable aspect considered in guaranteeing successful and...
Main Authors: | Jianwen Guo, Zhenzhong Sun, Jiaxin He, Xuejun Jia, Hongjuan Li, Xiaohui Yan, Haibin Chen, Hong Tang, GuoHong Wu |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2016-01-01
|
Series: | Science and Technology of Nuclear Installations |
Online Access: | http://dx.doi.org/10.1155/2016/9108751 |
Similar Items
-
Multilayered Pipe Cutting Test for Remote Handling Maintenance
by: Haibin Chen, et al.
Published: (2015-01-01) -
An Improved Shuffled Frog Leaping Algorithm for Assembly Sequence Planning of Remote Handling Maintenance in Radioactive Environment
by: Jianwen Guo, et al.
Published: (2015-01-01) -
Hybrid Optimization Algorithm of Particle Swarm Optimization and Cuckoo Search for Preventive Maintenance Period Optimization
by: Jianwen Guo, et al.
Published: (2016-01-01) -
Remote Inspection, Measurement and Handling for Maintenance and Operation at CERN
by: Keith Kershaw, et al.
Published: (2013-11-01) -
Development of a Remote Handling Robot for the Maintenance of an ITER-Like D-Shaped Vessel
by: Peihua Chen, et al.
Published: (2014-01-01)