Multi-objective optimisation of generation maintenance scheduling in restructured power systems based on global criterion method
Generation maintenance scheduling (GMS) is one of the most important scheduling problems in the restructured power systems. The maintenance time interval of generation units is the crucial factor of GMS for an operation lifespan of generation units, particularly within the smart grid which needs hig...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | IET Smart Grid |
Subjects: | |
Online Access: | https://digital-library.theiet.org/content/journals/10.1049/iet-stg.2018.0140 |