Suitability Evaluation of a Train’s Scheduled Section Travel Time
Two methods used to evaluate the suitability of a train’s scheduled section travel time (TSSTT) are theoretical modeling and data analysis. The first is suitable for newly constructed railway projects, the second can reveal the reliability of the train section running time (TSRT) under an...
Main Authors: | Maosheng Li, Qing Huang, Lixuan Yao, Yongliang Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2020-03-01
|
Series: | Sustainability |
Subjects: | |
Online Access: | https://www.mdpi.com/2071-1050/12/6/2399 |
Similar Items
-
TIME RESERVES DURING THE ORGANISATION OF FREIGHT TRAIN MOVEMENT ON SCHEDULE
by: D. M. Kozachenko, et al.
Published: (2015-03-01) -
EVALUATION OF THE TRANSITION TO THE ORGANIZATION OF FREIGHT TRAINS TRAFFIC BY THE SCHEDULE
by: Dmitriy KOZACHENKO, et al.
Published: (2016-03-01) -
Copula-Based Travel Time Distribution Estimation Considering Channelization Section Spillover
by: Yi Yu, et al.
Published: (2020-01-01) -
Metro Scheduling to Minimize Travel Time and Operating Cost Considering Spatial and Temporal Constraints on Passenger Boarding
by: Yuhe Zhou, et al.
Published: (2020-01-01) -
Development of the method for modeling the propagation of delays in noncyclic train scheduling on the railroads with mixed traffic
by: Tatyana Butko, et al.
Published: (2018-02-01)