Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The...
Main Authors: | , , , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
American Physical Society
2018-01-01
|
Series: | Physical Review Accelerators and Beams |
Online Access: | http://doi.org/10.1103/PhysRevAccelBeams.21.011001 |
id |
doaj-61ab6f43e19b42c2a0a0cadc27f139f2 |
---|---|
record_format |
Article |
spelling |
doaj-61ab6f43e19b42c2a0a0cadc27f139f22020-11-24T23:39:55ZengAmerican Physical SocietyPhysical Review Accelerators and Beams2469-98882018-01-0121101100110.1103/PhysRevAccelBeams.21.011001Stabilization of the arrival time of a relativistic electron beam to the 50 fs levelJ. RobertsP. SkowronskiP. N. BurrowsG. B. ChristianR. CorsiniA. GhigoF. MarcelliniC. PerryWe report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth >23 MHz. The system meets the requirements for CLIC.http://doi.org/10.1103/PhysRevAccelBeams.21.011001 |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
J. Roberts P. Skowronski P. N. Burrows G. B. Christian R. Corsini A. Ghigo F. Marcellini C. Perry |
spellingShingle |
J. Roberts P. Skowronski P. N. Burrows G. B. Christian R. Corsini A. Ghigo F. Marcellini C. Perry Stabilization of the arrival time of a relativistic electron beam to the 50 fs level Physical Review Accelerators and Beams |
author_facet |
J. Roberts P. Skowronski P. N. Burrows G. B. Christian R. Corsini A. Ghigo F. Marcellini C. Perry |
author_sort |
J. Roberts |
title |
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_short |
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_full |
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_fullStr |
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_full_unstemmed |
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
title_sort |
stabilization of the arrival time of a relativistic electron beam to the 50 fs level |
publisher |
American Physical Society |
series |
Physical Review Accelerators and Beams |
issn |
2469-9888 |
publishDate |
2018-01-01 |
description |
We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth >23 MHz. The system meets the requirements for CLIC. |
url |
http://doi.org/10.1103/PhysRevAccelBeams.21.011001 |
work_keys_str_mv |
AT jroberts stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT pskowronski stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT pnburrows stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT gbchristian stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT rcorsini stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT aghigo stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT fmarcellini stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel AT cperry stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel |
_version_ |
1725511697564696576 |