Stabilization of the arrival time of a relativistic electron beam to the 50 fs level

We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The...

Full description

Bibliographic Details
Main Authors: J. Roberts, P. Skowronski, P. N. Burrows, G. B. Christian, R. Corsini, A. Ghigo, F. Marcellini, C. Perry
Format: Article
Language:English
Published: American Physical Society 2018-01-01
Series:Physical Review Accelerators and Beams
Online Access:http://doi.org/10.1103/PhysRevAccelBeams.21.011001
id doaj-61ab6f43e19b42c2a0a0cadc27f139f2
record_format Article
spelling doaj-61ab6f43e19b42c2a0a0cadc27f139f22020-11-24T23:39:55ZengAmerican Physical SocietyPhysical Review Accelerators and Beams2469-98882018-01-0121101100110.1103/PhysRevAccelBeams.21.011001Stabilization of the arrival time of a relativistic electron beam to the 50 fs levelJ. RobertsP. SkowronskiP. N. BurrowsG. B. ChristianR. CorsiniA. GhigoF. MarcelliniC. PerryWe report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth >23  MHz. The system meets the requirements for CLIC.http://doi.org/10.1103/PhysRevAccelBeams.21.011001
collection DOAJ
language English
format Article
sources DOAJ
author J. Roberts
P. Skowronski
P. N. Burrows
G. B. Christian
R. Corsini
A. Ghigo
F. Marcellini
C. Perry
spellingShingle J. Roberts
P. Skowronski
P. N. Burrows
G. B. Christian
R. Corsini
A. Ghigo
F. Marcellini
C. Perry
Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
Physical Review Accelerators and Beams
author_facet J. Roberts
P. Skowronski
P. N. Burrows
G. B. Christian
R. Corsini
A. Ghigo
F. Marcellini
C. Perry
author_sort J. Roberts
title Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
title_short Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
title_full Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
title_fullStr Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
title_full_unstemmed Stabilization of the arrival time of a relativistic electron beam to the 50 fs level
title_sort stabilization of the arrival time of a relativistic electron beam to the 50 fs level
publisher American Physical Society
series Physical Review Accelerators and Beams
issn 2469-9888
publishDate 2018-01-01
description We report the results of a low-latency beam phase feed-forward system built to stabilize the arrival time of a relativistic electron beam. The system was operated at the Compact Linear Collider (CLIC) Test Facility (CTF3) at CERN where the beam arrival time was stabilized to approximately 50 fs. The system latency was 350 ns and the correction bandwidth >23  MHz. The system meets the requirements for CLIC.
url http://doi.org/10.1103/PhysRevAccelBeams.21.011001
work_keys_str_mv AT jroberts stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT pskowronski stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT pnburrows stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT gbchristian stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT rcorsini stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT aghigo stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT fmarcellini stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
AT cperry stabilizationofthearrivaltimeofarelativisticelectronbeamtothe50fslevel
_version_ 1725511697564696576