Waste heat availability in the raw meal department of a cement plant
The main aim of this study was to determine the available heat in the cement kiln exhaust gas subject to different process conditions. A Norwegian cement plant producing about 1.3 million tons of cement per year was used as a case study. A mass and energy balance was made for the raw meal department...
Main Authors: | Widuramina Sameendranath Amarasinghe, Ida Husum, Lars-André Tokheim |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2018-03-01
|
Series: | Case Studies in Thermal Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S2214157X17302174 |
Similar Items
-
Evaluation of optimization techniques for predicting exergy efficiency of the cement raw meal production process
by: Anthony I. Okoji, et al.
Published: (2021-01-01) -
Response of growing rabbits (Oryctolagus cuniculus) fed diets containing raw tallow (Detarium microcarpum) seed meal
by: Jiya Zhiri E., et al.
Published: (2018-01-01) -
Alternative Usage of Raw Material and Fuel in Cement Plants: Case Study
by: Şeyma Ordu, et al.
Published: (2017-07-01) -
Industrial waste materials as raw materials for the production of low heat hydration cement
by: Bušatlić Ilhan, et al.
Published: (2019-01-01) -
Simulation of cement raw material deposits using plurigaussian technique
by: Yünsel Tayfun Yusuf
Published: (2018-12-01)