FLOW SHOP SCHEDULING BASED ON PALMER-NEH, GUPTA-NEH AND DANNENBRING-NEH ALGORITHMS TO MINIMIZE THE ENERGY COST
In the manufacturing industry, the most widely used equipment is equipment that uses electricity. Electricity cost is one of the highest operational production costs after labor cost. So, it is very important to save and optimize the use of electrical equipment. One of the manufacturing industries i...
Main Authors: | Masrikhan Masrikhan, Dwi Agustina Kurniawati |
---|---|
Format: | Article |
Language: | Indonesian |
Published: |
Universitas Mercu Buana
2021-01-01
|
Series: | Jurnal Ilmiah SINERGI |
Subjects: | |
Online Access: | https://publikasi.mercubuana.ac.id/index.php/sinergi/article/view/8126 |
Similar Items
-
Two NEH Heuristic Improvements for Flowshop Scheduling Problem with Makespan Criterion
by: Christophe Sauvey, et al.
Published: (2020-04-01) -
Revisiting the NEH algorithm- the power of job insertion technique for optimizing the makespan in permutation flow shop scheduling
by: A. Baskar
Published: (2016-04-01) -
MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
by: Hendy Tannady
Published: (2013-06-01) -
MODIFIKASI MEKANISME PENENTUAN PENJADWALAN JOB PADA METODE DANNENBRING
by: Hendy Tannady
Published: (2013-06-01) -
An improved NEH heuristic to minimize makespan for flow shop scheduling problems
by: Sharma, Meenakshi, et al.
Published: (2021-01-01)