Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia

This paper evaluates the economic benefits of shorter construction times that can be attained by applying the New Simplified Procedure (NSP) in multi-storey buildings. The reference building was a multi-storey residential reinforced concrete framework structure with one-way slabs located in Bogotá,...

Full description

Bibliographic Details
Main Authors: Yezid Alexander Alvarado Vargas, Maria Isabel Perez Gomez, John Alexis Castellanos Reyes, Isabel Gasch Molina
Format: Article
Language:English
Published: Universidad Nacional de Colombia 2016-10-01
Series:Dyna
Subjects:
Online Access:https://revistas.unal.edu.co/index.php/dyna/article/view/56086
id doaj-6a89629aacba486c9d242d088bda3f36
record_format Article
spelling doaj-6a89629aacba486c9d242d088bda3f362020-11-25T02:28:20ZengUniversidad Nacional de Colombia Dyna0012-73532346-21832016-10-018319910210710.15446/dyna.v83n199.5608644288Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, ColombiaYezid Alexander Alvarado VargasMaria Isabel Perez GomezJohn Alexis Castellanos ReyesIsabel Gasch MolinaThis paper evaluates the economic benefits of shorter construction times that can be attained by applying the New Simplified Procedure (NSP) in multi-storey buildings. The reference building was a multi-storey residential reinforced concrete framework structure with one-way slabs located in Bogotá, Colombia. The study was divided into different phases including the characterization of the components, a study of the different methods to determine load transmissions between slabs and shores, and a review of the cost of renting shoring and formwork materials and labor costs for the building under study. After applying the procedure, an economic assessment was carried out on the execution times obtained in each of the operations studied. The analysis of the construction process of the building structure using the NSP showed that considerable savings can be achieved in construction times without any risk for the integrity of the structure.https://revistas.unal.edu.co/index.php/dyna/article/view/56086New Simplified Procedureshorestime estimationsload estimationsestimation of personnel and equipment costs
collection DOAJ
language English
format Article
sources DOAJ
author Yezid Alexander Alvarado Vargas
Maria Isabel Perez Gomez
John Alexis Castellanos Reyes
Isabel Gasch Molina
spellingShingle Yezid Alexander Alvarado Vargas
Maria Isabel Perez Gomez
John Alexis Castellanos Reyes
Isabel Gasch Molina
Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia
Dyna
New Simplified Procedure
shores
time estimations
load estimations
estimation of personnel and equipment costs
author_facet Yezid Alexander Alvarado Vargas
Maria Isabel Perez Gomez
John Alexis Castellanos Reyes
Isabel Gasch Molina
author_sort Yezid Alexander Alvarado Vargas
title Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia
title_short Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia
title_full Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia
title_fullStr Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia
title_full_unstemmed Technical and economic study of striking and clearing operations in buildings under construction. Case study in Bogotá, Colombia
title_sort technical and economic study of striking and clearing operations in buildings under construction. case study in bogotá, colombia
publisher Universidad Nacional de Colombia
series Dyna
issn 0012-7353
2346-2183
publishDate 2016-10-01
description This paper evaluates the economic benefits of shorter construction times that can be attained by applying the New Simplified Procedure (NSP) in multi-storey buildings. The reference building was a multi-storey residential reinforced concrete framework structure with one-way slabs located in Bogotá, Colombia. The study was divided into different phases including the characterization of the components, a study of the different methods to determine load transmissions between slabs and shores, and a review of the cost of renting shoring and formwork materials and labor costs for the building under study. After applying the procedure, an economic assessment was carried out on the execution times obtained in each of the operations studied. The analysis of the construction process of the building structure using the NSP showed that considerable savings can be achieved in construction times without any risk for the integrity of the structure.
topic New Simplified Procedure
shores
time estimations
load estimations
estimation of personnel and equipment costs
url https://revistas.unal.edu.co/index.php/dyna/article/view/56086
work_keys_str_mv AT yezidalexanderalvaradovargas technicalandeconomicstudyofstrikingandclearingoperationsinbuildingsunderconstructioncasestudyinbogotacolombia
AT mariaisabelperezgomez technicalandeconomicstudyofstrikingandclearingoperationsinbuildingsunderconstructioncasestudyinbogotacolombia
AT johnalexiscastellanosreyes technicalandeconomicstudyofstrikingandclearingoperationsinbuildingsunderconstructioncasestudyinbogotacolombia
AT isabelgaschmolina technicalandeconomicstudyofstrikingandclearingoperationsinbuildingsunderconstructioncasestudyinbogotacolombia
_version_ 1724838718908399616