How to Use MRP in Continuous Production Industries When Order Type is Lot for Lot
The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Iran University of Science & Technology
2010-06-01
|
Series: | International Journal of Industrial Engineering and Production Research |
Subjects: | |
Online Access: | http://ijiepr.iust.ac.ir/browse.php?a_code=A-10-1-97&slc_lang=en&sid=1 |
Summary: | The Materials Requirements Planning (MRP) method that is applied in production planning and management has some weaknesses. One of its weaknesses is that the time in MRP method is discrete, and is considered as time period. Hence we are not able to order our requirements at irregular time moments or periods. In this paper, a new form of MRP is introduced that is named Continuous Materials Requirements Planning (CMRP) approach. We discuss the disadvantages of Discrete MRP (DMRP) approach and analyze the conditions, applications and the manner of applying CMRP approach in our problems. |
---|---|
ISSN: | 2008-4889 2345-363X |