Determining the optimal cycle length for a multiproduct EMQ problem considering rework and overtime options
To satisfy the increasing trend of diverse customer product needs and to cope with internal capacity constraints, the management of current manufacturing firms must plan multiproduct batch fabrication and be able to reduce its completion time and/or smooth overall production schedules. Furthermore,...
Main Authors: | Yuan-Shyi Peter Chiu, Cheng-Sian Wu, Victoria Chiu, Peng-Cheng Sung |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2020-05-01
|
Series: | Journal of King Saud University: Engineering Sciences |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1018363918312364 |
Similar Items
-
Mathematical modeling for exploring the effects of overtime option, rework, and discontinuous inventory issuing policy on EMQ model
by: Singa Wang Chiu, et al.
Published: (2018-09-01) -
Studying the effect of stochastic breakdowns, overtime, and rework on inventory replenishment decision
by: Yuan-Shyi Peter Chiu, et al.
Published: (2021-02-01) -
A decision model for a quality-assured EPQ-based intra-supply chain system considering overtime option
by: Lin Hong-Dar, et al.
Published: (2019-01-01) -
A postponement model for multi-item replenishment decision considering overtime, commonality, and quality reassurance
by: Yuan-Shyi Peter Chiu, et al.
Published: (2020-06-01) -
Alternative fabrication scheme to study effects of rework of nonconforming products and delayed differentiation on a multiproduct supply-chain system
by: Yuan-Shyi Peter Chiu, et al.
Published: (2017-07-01)