Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving

With the increasing penetration of the renewables, power system is with the challenge of the frequency stability. Battery energy storage systems (BESS) is regarded as an effective way providing frequency regulation services (FRS). However, the high-quality frequency regulation sources fail to be ful...

Full description

Bibliographic Details
Main Authors: Shengqi Zhang, Heyu Liu, Fei Wang, Yuhui Miao, Jingwen Dong
Format: Article
Language:English
Published: Elsevier 2020-12-01
Series:Energy Reports
Subjects:
Online Access:http://www.sciencedirect.com/science/article/pii/S2352484720316322
id doaj-6ff97a3f49ab4f95bd45d772cec80350
record_format Article
spelling doaj-6ff97a3f49ab4f95bd45d772cec803502020-12-23T05:02:37ZengElsevierEnergy Reports2352-48472020-12-016502508Dual-stage operation strategy of BESS for frequency regulation considering planned peak shavingShengqi Zhang0Heyu Liu1Fei Wang2Yuhui Miao3Jingwen Dong4School of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200444, ChinaSchool of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200444, ChinaCorresponding author.; School of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200444, ChinaSchool of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200444, ChinaSchool of Mechatronic Engineering and Automation, Shanghai University, Shanghai 200444, ChinaWith the increasing penetration of the renewables, power system is with the challenge of the frequency stability. Battery energy storage systems (BESS) is regarded as an effective way providing frequency regulation services (FRS). However, the high-quality frequency regulation sources fail to be fully utilized, because the current ancillary services market rules cannot quantify the contribution of BESS in FRS in current ancillary services market rules. Therefore, it is significant that the existing BESS, which have already provided the peak shaving service (PSS), are further involved in the FRS. In this paper, a dual-stage operation strategy (DOS) for BESS based on dynamic programming method (DPM) is proposed. In detail, DPM is applied in Stage I planning BESS in PSS, and DPM is applied again in Stage II arranging BESS in FRS. At last, the promising results show the application of DOS takes full advantage of BESS in FRS irrelevant to ancillary services market rules. Meanwhile, the original arrangement of BESS in PSS and the corresponding profit are both satisfied.http://www.sciencedirect.com/science/article/pii/S2352484720316322Battery energy storage systemDynamic programmingFrequency regulationPeak shaving
collection DOAJ
language English
format Article
sources DOAJ
author Shengqi Zhang
Heyu Liu
Fei Wang
Yuhui Miao
Jingwen Dong
spellingShingle Shengqi Zhang
Heyu Liu
Fei Wang
Yuhui Miao
Jingwen Dong
Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving
Energy Reports
Battery energy storage system
Dynamic programming
Frequency regulation
Peak shaving
author_facet Shengqi Zhang
Heyu Liu
Fei Wang
Yuhui Miao
Jingwen Dong
author_sort Shengqi Zhang
title Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving
title_short Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving
title_full Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving
title_fullStr Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving
title_full_unstemmed Dual-stage operation strategy of BESS for frequency regulation considering planned peak shaving
title_sort dual-stage operation strategy of bess for frequency regulation considering planned peak shaving
publisher Elsevier
series Energy Reports
issn 2352-4847
publishDate 2020-12-01
description With the increasing penetration of the renewables, power system is with the challenge of the frequency stability. Battery energy storage systems (BESS) is regarded as an effective way providing frequency regulation services (FRS). However, the high-quality frequency regulation sources fail to be fully utilized, because the current ancillary services market rules cannot quantify the contribution of BESS in FRS in current ancillary services market rules. Therefore, it is significant that the existing BESS, which have already provided the peak shaving service (PSS), are further involved in the FRS. In this paper, a dual-stage operation strategy (DOS) for BESS based on dynamic programming method (DPM) is proposed. In detail, DPM is applied in Stage I planning BESS in PSS, and DPM is applied again in Stage II arranging BESS in FRS. At last, the promising results show the application of DOS takes full advantage of BESS in FRS irrelevant to ancillary services market rules. Meanwhile, the original arrangement of BESS in PSS and the corresponding profit are both satisfied.
topic Battery energy storage system
Dynamic programming
Frequency regulation
Peak shaving
url http://www.sciencedirect.com/science/article/pii/S2352484720316322
work_keys_str_mv AT shengqizhang dualstageoperationstrategyofbessforfrequencyregulationconsideringplannedpeakshaving
AT heyuliu dualstageoperationstrategyofbessforfrequencyregulationconsideringplannedpeakshaving
AT feiwang dualstageoperationstrategyofbessforfrequencyregulationconsideringplannedpeakshaving
AT yuhuimiao dualstageoperationstrategyofbessforfrequencyregulationconsideringplannedpeakshaving
AT jingwendong dualstageoperationstrategyofbessforfrequencyregulationconsideringplannedpeakshaving
_version_ 1724373309294903296