Measurement of bridge body across the river Labe in Mělník
Long-span concrete prestressed bridges are sensitive for long-term deflections growing. Bridge over the river Labe near Mělníkis a typical example of this structural type. 15 years after bridge opening, midspan deflection still increases. Detail surveyingof the superstructure was made to identify po...
Main Authors: | Rudolf Urban, Martin Štroner, Lukáš Vráblík |
---|---|
Format: | Article |
Language: | English |
Published: |
Technical University of Kosice
2009-11-01
|
Series: | Acta Montanistica Slovaca |
Subjects: | |
Online Access: | http://actamont.tuke.sk/pdf/2009/s1/13vrablik.pdf |
Similar Items
-
Continuous Prestress in Launched Extradosed Bridges
by: Philippe Van Bogaert, et al.
Published: (2019-06-01) -
Model of strain-related prestress losses in pretensioned simply supported bridge girders
by: Gallardo Méndez, José Manuel
Published: (2014) -
Shear and Flexural Capacity of High Strength Prestressed Concrete Bridge Girders
by: Higgs, Arek Tilmann
Published: (2013) -
Computer design and analysis of simple span prestressed concrete highway bridge girders
by: Underwood, John Martin
Published: (2008) -
Anchorage-controlled shear capacity of prestressed concrete bridge girders
by: Langefeld, David Philip
Published: (2012)