A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework

Construction delays are considered a common worldwide problem. Previous studies have investigated construction delay factors from the perspectives of different project stakeholders. However, a thorough analysis of such delays on different types of construction projects in different geographies is st...

Full description

Bibliographic Details
Main Authors: Mohammad Barqawi, Heap-Yih Chong, Emil Jonescu
Format: Article
Language:English
Published: Hindawi Limited 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/6696203
id doaj-79f6a0f19a024ebe8a845352782c1273
record_format Article
spelling doaj-79f6a0f19a024ebe8a845352782c12732021-05-03T00:01:33ZengHindawi LimitedAdvances in Civil Engineering1687-80942021-01-01202110.1155/2021/6696203A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research FrameworkMohammad Barqawi0Heap-Yih Chong1Emil Jonescu2School of Design and the Built EnvironmentSchool of Design and the Built EnvironmentPrincipal Research and DevelopmentConstruction delays are considered a common worldwide problem. Previous studies have investigated construction delay factors from the perspectives of different project stakeholders. However, a thorough analysis of such delays on different types of construction projects in different geographies is still lacking, precisely the effect of employers’ delays in traditional and building information modeling (BIM)-enabled projects. This research proposes a research framework to address potential employer-caused delay factors in traditional and BIM-enabled projects. A cross-sectional literature search was carried out to review construction delay factors and employer-caused delay factors in traditional and BIM-enabled projects. The study found that: (a) a research gap exists in traditional construction delay studies in specific continents and project types as well as in BIM-enabled project studies, (b) delay aspects have not been addressed or have been partially addressed in previous studies, and (c) a relationship model between employer-caused delay factors and success factors can be developed by studying the effects of BIM barriers and implementation strategies. This paper is the first to present a comprehensive review on delay factors and tender a novel framework to address employer-caused delay factors in both traditional and BIM-enabled projects.http://dx.doi.org/10.1155/2021/6696203
collection DOAJ
language English
format Article
sources DOAJ
author Mohammad Barqawi
Heap-Yih Chong
Emil Jonescu
spellingShingle Mohammad Barqawi
Heap-Yih Chong
Emil Jonescu
A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
Advances in Civil Engineering
author_facet Mohammad Barqawi
Heap-Yih Chong
Emil Jonescu
author_sort Mohammad Barqawi
title A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
title_short A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
title_full A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
title_fullStr A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
title_full_unstemmed A Review of Employer-Caused Delay Factors in Traditional and Building Information Modeling (BIM)-Enabled Projects: Research Framework
title_sort review of employer-caused delay factors in traditional and building information modeling (bim)-enabled projects: research framework
publisher Hindawi Limited
series Advances in Civil Engineering
issn 1687-8094
publishDate 2021-01-01
description Construction delays are considered a common worldwide problem. Previous studies have investigated construction delay factors from the perspectives of different project stakeholders. However, a thorough analysis of such delays on different types of construction projects in different geographies is still lacking, precisely the effect of employers’ delays in traditional and building information modeling (BIM)-enabled projects. This research proposes a research framework to address potential employer-caused delay factors in traditional and BIM-enabled projects. A cross-sectional literature search was carried out to review construction delay factors and employer-caused delay factors in traditional and BIM-enabled projects. The study found that: (a) a research gap exists in traditional construction delay studies in specific continents and project types as well as in BIM-enabled project studies, (b) delay aspects have not been addressed or have been partially addressed in previous studies, and (c) a relationship model between employer-caused delay factors and success factors can be developed by studying the effects of BIM barriers and implementation strategies. This paper is the first to present a comprehensive review on delay factors and tender a novel framework to address employer-caused delay factors in both traditional and BIM-enabled projects.
url http://dx.doi.org/10.1155/2021/6696203
work_keys_str_mv AT mohammadbarqawi areviewofemployercauseddelayfactorsintraditionalandbuildinginformationmodelingbimenabledprojectsresearchframework
AT heapyihchong areviewofemployercauseddelayfactorsintraditionalandbuildinginformationmodelingbimenabledprojectsresearchframework
AT emiljonescu areviewofemployercauseddelayfactorsintraditionalandbuildinginformationmodelingbimenabledprojectsresearchframework
AT mohammadbarqawi reviewofemployercauseddelayfactorsintraditionalandbuildinginformationmodelingbimenabledprojectsresearchframework
AT heapyihchong reviewofemployercauseddelayfactorsintraditionalandbuildinginformationmodelingbimenabledprojectsresearchframework
AT emiljonescu reviewofemployercauseddelayfactorsintraditionalandbuildinginformationmodelingbimenabledprojectsresearchframework
_version_ 1714634934036987904