Summary: | In actual engineering construction, the calculation of earthwork directly affects the cost budget of the project and the selection of the optimal plan. Therefore, the calculation accuracy and efficiency of the earthwork are very important. This article introduces the construction principle of the TIN model. Based on the TIN model, the earthwork calculation is carried out by the triangular prism method. The data of a fill-excavation balance project in a rugged mountainous area is selected, and under different conditions, the TIN network method and the square grid method are used to calculate the earthwork, and the results are compared and analyzed with accuracy. Estimate. After comparative analysis, it is found that the earthwork calculation using the TIN network method is simple and cheap, and the calculation result is more accurate. It is better than the traditional square grid method as a whole, and can be used in the actual engineering earthwork calculation.
|