Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area

The high-drainage roadway construction face of the working face is used to pre-drill the borehole under the tunneling face, and the problem of poor water return in the hole is solved by grouting the surrounding rock cracks in the deep and shallow holes of the drill floor. The “two plugs and one note...

Full description

Bibliographic Details
Main Author: Yi Enbing
Format: Article
Language:English
Published: EDP Sciences 2021-01-01
Series:E3S Web of Conferences
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/21/e3sconf_aeecs2021_01021.pdf
id doaj-7b60cf77714e4a5c8550e1e07cdd78bc
record_format Article
spelling doaj-7b60cf77714e4a5c8550e1e07cdd78bc2021-05-04T12:16:55ZengEDP SciencesE3S Web of Conferences2267-12422021-01-012450102110.1051/e3sconf/202124501021e3sconf_aeecs2021_01021Technology of eliminating outburst by downward drilling in highground pressure and serious outburst areaYi EnbingThe high-drainage roadway construction face of the working face is used to pre-drill the borehole under the tunneling face, and the problem of poor water return in the hole is solved by grouting the surrounding rock cracks in the deep and shallow holes of the drill floor. The “two plugs and one note” sealing method was adopted to ensure that the sealing holes were tight and airtight; the water pipes were blown all the way in the hole, and the single hole, grouping and timed water blowing work targets were realized, and the drilling effect of the downhole drilling was improved. A set of efficient and rapid down-drilling and hole-dissipation management mode has been formed, which has achieved the goal of high-efficiency outburst of coal seams and technical and economic integration in areas with high ground pressure and serious safety and economic benefits.https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/21/e3sconf_aeecs2021_01021.pdf
collection DOAJ
language English
format Article
sources DOAJ
author Yi Enbing
spellingShingle Yi Enbing
Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
E3S Web of Conferences
author_facet Yi Enbing
author_sort Yi Enbing
title Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
title_short Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
title_full Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
title_fullStr Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
title_full_unstemmed Technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
title_sort technology of eliminating outburst by downward drilling in highground pressure and serious outburst area
publisher EDP Sciences
series E3S Web of Conferences
issn 2267-1242
publishDate 2021-01-01
description The high-drainage roadway construction face of the working face is used to pre-drill the borehole under the tunneling face, and the problem of poor water return in the hole is solved by grouting the surrounding rock cracks in the deep and shallow holes of the drill floor. The “two plugs and one note” sealing method was adopted to ensure that the sealing holes were tight and airtight; the water pipes were blown all the way in the hole, and the single hole, grouping and timed water blowing work targets were realized, and the drilling effect of the downhole drilling was improved. A set of efficient and rapid down-drilling and hole-dissipation management mode has been formed, which has achieved the goal of high-efficiency outburst of coal seams and technical and economic integration in areas with high ground pressure and serious safety and economic benefits.
url https://www.e3s-conferences.org/articles/e3sconf/pdf/2021/21/e3sconf_aeecs2021_01021.pdf
work_keys_str_mv AT yienbing technologyofeliminatingoutburstbydownwarddrillinginhighgroundpressureandseriousoutburstarea
_version_ 1721479305274327040