Whole Process Cost Management Control of Dangerous Chemical Product Construction Projects
The purpose of this study is to strengthen the effect of whole process cost management (WPCM) in the Dangerous Chemical construction projects. To this end, this paper studies the WPCM control of Dangerous Chemical construction projects. Building Information Model (BIM) technology was introduced into...
Main Authors: | Rui Shan, Xianfei Xiao, Jing Luan, Yun Guo, Qiuyan Kang |
---|---|
Format: | Article |
Language: | English |
Published: |
AIDIC Servizi S.r.l.
2018-12-01
|
Series: | Chemical Engineering Transactions |
Online Access: | https://www.cetjournal.it/index.php/cet/article/view/9497 |
Similar Items
-
Electromechanical Feed Control System in Chemical Dangerous Goods Production
by: Guizhong Guo
Published: (2018-12-01) -
Research on Logistics Solutions for Dangerous Chemical Products
by: Chengwu Zheng
Published: (2017-12-01) -
Research on the Construction Method of Intelligent Prediction and Analysis Model for the Whole Process of Power Grid Project Cost
by: Liang Zuobin, et al.
Published: (2020-01-01) -
DANGEROUSNESS OF CHEMICAL PRODUCTS AND WASTE FROM HOSPITAL CARE
by: Taiza Florêncio Costa, et al.
Published: (2012-06-01) -
Establishment and Empirical Analysis of Logistics Transportation Cost Optimization System for Dangerous Chemicals
by: Yang Xu
Published: (2018-12-01)