Polymer Concrete for Bridge Deck Closure Joints in Accelerated Bridge Construction

Prefabricated concrete bridge deck panels are utilized in Accelerated Bridge Construction (ABC) to simplify bridge deck construction. Concrete with good bond and shear strength as well as excellent flowability is required to fill bridge deck closure joints. This paper discusses the use of polymer co...

Full description

Bibliographic Details
Main Authors: Islam Mantawy, Rahulreddy Chennareddy, Moneeb Genedy, Mahmoud Reda Taha
Format: Article
Language:English
Published: MDPI AG 2019-06-01
Series:Infrastructures
Subjects:
Online Access:https://www.mdpi.com/2412-3811/4/2/31