Polymer Concrete for Bridge Deck Closure Joints in Accelerated Bridge Construction
Prefabricated concrete bridge deck panels are utilized in Accelerated Bridge Construction (ABC) to simplify bridge deck construction. Concrete with good bond and shear strength as well as excellent flowability is required to fill bridge deck closure joints. This paper discusses the use of polymer co...
Main Authors: | Islam Mantawy, Rahulreddy Chennareddy, Moneeb Genedy, Mahmoud Reda Taha |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-06-01
|
Series: | Infrastructures |
Subjects: | |
Online Access: | https://www.mdpi.com/2412-3811/4/2/31 |
Similar Items
-
Effects of Single Panel Replacement of a Full-Scale, Full-Depth, Precast Concrete Bridge Deck System
by: Perry, Jason Robert
Published: (2012) -
Alternatives to Steel Grid Bridge Decks
by: Saleem, Muhammad A
Published: (2011) -
Influence of precast concrete panel surface condition on behavior of composite bridge decks at skewed expansion joints
by: Donnelly, Kristen Shawn
Published: (2009) -
Structural Performance of a Full-Depth Precast Concrete Bridge Deck System
by: Mander, Thomas
Published: (2010) -
Reducing top mat reinforcement in bridge decks
by: Foster, Stephen Wroe, 1986-
Published: (2010)