Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach

Abstract The overall performance of gas reservoirs and the optimization of production, as well as its sensitivity analysis, are affected by several factors such as reservoir pressure, well configuration and surface facilities. The Habiganj well no. 06 (HBJ-06) is one of the significant gas-producing...

Full description

Bibliographic Details
Main Authors: Md. Shaheen Shah, Md Hafijur Rahaman Khan, Ananna Rahman, Stephen Butt
Format: Article
Language:English
Published: SpringerOpen 2020-05-01
Series:Journal of Petroleum Exploration and Production Technology
Subjects:
IPR
VLP
Online Access:https://doi.org/10.1007/s13202-020-00908-2
id doaj-88015c3e54a5458db262361f29dac35d
record_format Article
spelling doaj-88015c3e54a5458db262361f29dac35d2021-05-30T11:25:34ZengSpringerOpenJournal of Petroleum Exploration and Production Technology2190-05582190-05662020-05-011083557356810.1007/s13202-020-00908-2Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approachMd. Shaheen Shah0Md Hafijur Rahaman Khan1Ananna Rahman2Stephen Butt3Department of Oil and Gas Engineering, Memorial University of NewfoundlandKey Laboratory of Ocean and Marginal Sea Geology, South China Sea Institute of Oceanology, Chinese Academy of SciencesKey Laboratory of Ocean and Marginal Sea Geology, South China Sea Institute of Oceanology, Chinese Academy of SciencesDepartment of Oil and Gas Engineering, Memorial University of NewfoundlandAbstract The overall performance of gas reservoirs and the optimization of production, as well as its sensitivity analysis, are affected by several factors such as reservoir pressure, well configuration and surface facilities. The Habiganj well no. 06 (HBJ-06) is one of the significant gas-producing vertical wells of the Habiganj gas field, currently producing 14.963 MMscfd of natural gas from the upper gas sand. The widely used Nodal analysis is an optimization technique to improve the performance and was applied for the HBJ-06 to increase its production rate by optimizing manners. By this analysis, each component starting from the reservoir to the outlet pressure of the separator was identified as a resistance in the system by evaluating their inflow performance relationship and vertical lift performance. The F.A.S.T. VirtuWell™ software package was used to perform this analysis, where the declinations of wellhead pressures were suggested as 1300, 1200, 1100 and 1000 psi(a) without any modification of the tubing diameter and skin factor. Hence, the respective optimized rates of the daily gas production were increased to 38.481, 40.993, 43.153 and 46.016 MMscfd. At the same time, the optimized condensate gas ratio was calculated as 0.07, 0.06, 0.06 and 0.05, associated with the optimized condensate water ratio of 0.11, 0.10, 0.09 and 0.08, respectively.https://doi.org/10.1007/s13202-020-00908-2Nodal analysisGas production optimizationF.A.S.T VirtuWell™IPRVLPHabiganj gas field
collection DOAJ
language English
format Article
sources DOAJ
author Md. Shaheen Shah
Md Hafijur Rahaman Khan
Ananna Rahman
Stephen Butt
spellingShingle Md. Shaheen Shah
Md Hafijur Rahaman Khan
Ananna Rahman
Stephen Butt
Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach
Journal of Petroleum Exploration and Production Technology
Nodal analysis
Gas production optimization
F.A.S.T VirtuWell™
IPR
VLP
Habiganj gas field
author_facet Md. Shaheen Shah
Md Hafijur Rahaman Khan
Ananna Rahman
Stephen Butt
author_sort Md. Shaheen Shah
title Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach
title_short Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach
title_full Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach
title_fullStr Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach
title_full_unstemmed Production optimization in well-6 of Habiganj gas field, Bangladesh: a prospective application of Nodal analysis approach
title_sort production optimization in well-6 of habiganj gas field, bangladesh: a prospective application of nodal analysis approach
publisher SpringerOpen
series Journal of Petroleum Exploration and Production Technology
issn 2190-0558
2190-0566
publishDate 2020-05-01
description Abstract The overall performance of gas reservoirs and the optimization of production, as well as its sensitivity analysis, are affected by several factors such as reservoir pressure, well configuration and surface facilities. The Habiganj well no. 06 (HBJ-06) is one of the significant gas-producing vertical wells of the Habiganj gas field, currently producing 14.963 MMscfd of natural gas from the upper gas sand. The widely used Nodal analysis is an optimization technique to improve the performance and was applied for the HBJ-06 to increase its production rate by optimizing manners. By this analysis, each component starting from the reservoir to the outlet pressure of the separator was identified as a resistance in the system by evaluating their inflow performance relationship and vertical lift performance. The F.A.S.T. VirtuWell™ software package was used to perform this analysis, where the declinations of wellhead pressures were suggested as 1300, 1200, 1100 and 1000 psi(a) without any modification of the tubing diameter and skin factor. Hence, the respective optimized rates of the daily gas production were increased to 38.481, 40.993, 43.153 and 46.016 MMscfd. At the same time, the optimized condensate gas ratio was calculated as 0.07, 0.06, 0.06 and 0.05, associated with the optimized condensate water ratio of 0.11, 0.10, 0.09 and 0.08, respectively.
topic Nodal analysis
Gas production optimization
F.A.S.T VirtuWell™
IPR
VLP
Habiganj gas field
url https://doi.org/10.1007/s13202-020-00908-2
work_keys_str_mv AT mdshaheenshah productionoptimizationinwell6ofhabiganjgasfieldbangladeshaprospectiveapplicationofnodalanalysisapproach
AT mdhafijurrahamankhan productionoptimizationinwell6ofhabiganjgasfieldbangladeshaprospectiveapplicationofnodalanalysisapproach
AT anannarahman productionoptimizationinwell6ofhabiganjgasfieldbangladeshaprospectiveapplicationofnodalanalysisapproach
AT stephenbutt productionoptimizationinwell6ofhabiganjgasfieldbangladeshaprospectiveapplicationofnodalanalysisapproach
_version_ 1721420387740286976