Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
The joint scheduling of quay cranes (QCs), yard cranes (YCs), and yard trucks (YTs) is critical to achieving good overall performance for a container terminal. However, there are only a few such integrated studies. Especially, those who have taken the vessel stowage plan (VSP) into consideration are...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2021-09-01
|
Series: | Mathematics |
Subjects: | |
Online Access: | https://www.mdpi.com/2227-7390/9/18/2236 |
id |
doaj-89b5b886b3db40c89c0edd29aba93a1f |
---|---|
record_format |
Article |
spelling |
doaj-89b5b886b3db40c89c0edd29aba93a1f2021-09-26T00:38:07ZengMDPI AGMathematics2227-73902021-09-0192236223610.3390/math9182236Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization ApproachHsien-Pin Hsu0Chia-Nan Wang1Hsin-Pin Fu2Thanh-Tuan Dang3Department of Supply Chain Management, National Kaohsiung University of Science and Technology, Kaohsiung 81157, TaiwanDepartment of Industrial Engineering and Management, National Kaohsiung University of Science and Technology, Kaohsiung 80778, TaiwanDepartment of Marketing and Distribution Management, National Kaohsiung University of Science and Technology, Kaohsiung 824, TaiwanDepartment of Industrial Engineering and Management, National Kaohsiung University of Science and Technology, Kaohsiung 80778, TaiwanThe joint scheduling of quay cranes (QCs), yard cranes (YCs), and yard trucks (YTs) is critical to achieving good overall performance for a container terminal. However, there are only a few such integrated studies. Especially, those who have taken the vessel stowage plan (VSP) into consideration are very rare. The VSP is a plan assigning each container a stowage position in a vessel. It affects the QC operations directly and considerably. Neglecting this plan will cause problems when loading/unloading containers into/from a ship or even congest the YT and YC operations in the upstream. In this research, a framework of simulation-based optimization methods have been proposed firstly. Then, four kinds of heuristics/metaheuristics has been employed in this framework, such as sort-by-bay (SBB), genetic algorithm (GA), particle swarm optimization (PSO), and multiple groups particle swarm optimization (MGPSO), to deal with the yard crane scheduling problem (YCSP), yard truck scheduling problem (YTSP), and quay crane scheduling problem (QCSP) simultaneously for export containers, taking operational constraints into consideration. The objective aims to minimize makespan. Each of the simulation-based optimization methods includes three components, load-balancing heuristic, sequencing method, and simulation model. Experiments have been conducted to investigate the effectiveness of different simulation-based optimization methods. The results show that the MGPSO outperforms the others.https://www.mdpi.com/2227-7390/9/18/2236yard craneyard truckquay cranecontainer terminalsimulation-based optimization methodexperiment |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Hsien-Pin Hsu Chia-Nan Wang Hsin-Pin Fu Thanh-Tuan Dang |
spellingShingle |
Hsien-Pin Hsu Chia-Nan Wang Hsin-Pin Fu Thanh-Tuan Dang Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach Mathematics yard crane yard truck quay crane container terminal simulation-based optimization method experiment |
author_facet |
Hsien-Pin Hsu Chia-Nan Wang Hsin-Pin Fu Thanh-Tuan Dang |
author_sort |
Hsien-Pin Hsu |
title |
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach |
title_short |
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach |
title_full |
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach |
title_fullStr |
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach |
title_full_unstemmed |
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach |
title_sort |
joint scheduling of yard crane, yard truck, and quay crane for container terminal considering vessel stowage plan: an integrated simulation-based optimization approach |
publisher |
MDPI AG |
series |
Mathematics |
issn |
2227-7390 |
publishDate |
2021-09-01 |
description |
The joint scheduling of quay cranes (QCs), yard cranes (YCs), and yard trucks (YTs) is critical to achieving good overall performance for a container terminal. However, there are only a few such integrated studies. Especially, those who have taken the vessel stowage plan (VSP) into consideration are very rare. The VSP is a plan assigning each container a stowage position in a vessel. It affects the QC operations directly and considerably. Neglecting this plan will cause problems when loading/unloading containers into/from a ship or even congest the YT and YC operations in the upstream. In this research, a framework of simulation-based optimization methods have been proposed firstly. Then, four kinds of heuristics/metaheuristics has been employed in this framework, such as sort-by-bay (SBB), genetic algorithm (GA), particle swarm optimization (PSO), and multiple groups particle swarm optimization (MGPSO), to deal with the yard crane scheduling problem (YCSP), yard truck scheduling problem (YTSP), and quay crane scheduling problem (QCSP) simultaneously for export containers, taking operational constraints into consideration. The objective aims to minimize makespan. Each of the simulation-based optimization methods includes three components, load-balancing heuristic, sequencing method, and simulation model. Experiments have been conducted to investigate the effectiveness of different simulation-based optimization methods. The results show that the MGPSO outperforms the others. |
topic |
yard crane yard truck quay crane container terminal simulation-based optimization method experiment |
url |
https://www.mdpi.com/2227-7390/9/18/2236 |
work_keys_str_mv |
AT hsienpinhsu jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach AT chiananwang jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach AT hsinpinfu jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach AT thanhtuandang jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach |
_version_ |
1716870180439588864 |