Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach

The joint scheduling of quay cranes (QCs), yard cranes (YCs), and yard trucks (YTs) is critical to achieving good overall performance for a container terminal. However, there are only a few such integrated studies. Especially, those who have taken the vessel stowage plan (VSP) into consideration are...

Full description

Bibliographic Details
Main Authors: Hsien-Pin Hsu, Chia-Nan Wang, Hsin-Pin Fu, Thanh-Tuan Dang
Format: Article
Language:English
Published: MDPI AG 2021-09-01
Series:Mathematics
Subjects:
Online Access:https://www.mdpi.com/2227-7390/9/18/2236
id doaj-89b5b886b3db40c89c0edd29aba93a1f
record_format Article
spelling doaj-89b5b886b3db40c89c0edd29aba93a1f2021-09-26T00:38:07ZengMDPI AGMathematics2227-73902021-09-0192236223610.3390/math9182236Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization ApproachHsien-Pin Hsu0Chia-Nan Wang1Hsin-Pin Fu2Thanh-Tuan Dang3Department of Supply Chain Management, National Kaohsiung University of Science and Technology, Kaohsiung 81157, TaiwanDepartment of Industrial Engineering and Management, National Kaohsiung University of Science and Technology, Kaohsiung 80778, TaiwanDepartment of Marketing and Distribution Management, National Kaohsiung University of Science and Technology, Kaohsiung 824, TaiwanDepartment of Industrial Engineering and Management, National Kaohsiung University of Science and Technology, Kaohsiung 80778, TaiwanThe joint scheduling of quay cranes (QCs), yard cranes (YCs), and yard trucks (YTs) is critical to achieving good overall performance for a container terminal. However, there are only a few such integrated studies. Especially, those who have taken the vessel stowage plan (VSP) into consideration are very rare. The VSP is a plan assigning each container a stowage position in a vessel. It affects the QC operations directly and considerably. Neglecting this plan will cause problems when loading/unloading containers into/from a ship or even congest the YT and YC operations in the upstream. In this research, a framework of simulation-based optimization methods have been proposed firstly. Then, four kinds of heuristics/metaheuristics has been employed in this framework, such as sort-by-bay (SBB), genetic algorithm (GA), particle swarm optimization (PSO), and multiple groups particle swarm optimization (MGPSO), to deal with the yard crane scheduling problem (YCSP), yard truck scheduling problem (YTSP), and quay crane scheduling problem (QCSP) simultaneously for export containers, taking operational constraints into consideration. The objective aims to minimize makespan. Each of the simulation-based optimization methods includes three components, load-balancing heuristic, sequencing method, and simulation model. Experiments have been conducted to investigate the effectiveness of different simulation-based optimization methods. The results show that the MGPSO outperforms the others.https://www.mdpi.com/2227-7390/9/18/2236yard craneyard truckquay cranecontainer terminalsimulation-based optimization methodexperiment
collection DOAJ
language English
format Article
sources DOAJ
author Hsien-Pin Hsu
Chia-Nan Wang
Hsin-Pin Fu
Thanh-Tuan Dang
spellingShingle Hsien-Pin Hsu
Chia-Nan Wang
Hsin-Pin Fu
Thanh-Tuan Dang
Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
Mathematics
yard crane
yard truck
quay crane
container terminal
simulation-based optimization method
experiment
author_facet Hsien-Pin Hsu
Chia-Nan Wang
Hsin-Pin Fu
Thanh-Tuan Dang
author_sort Hsien-Pin Hsu
title Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
title_short Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
title_full Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
title_fullStr Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
title_full_unstemmed Joint Scheduling of Yard Crane, Yard Truck, and Quay Crane for Container Terminal Considering Vessel Stowage Plan: An Integrated Simulation-Based Optimization Approach
title_sort joint scheduling of yard crane, yard truck, and quay crane for container terminal considering vessel stowage plan: an integrated simulation-based optimization approach
publisher MDPI AG
series Mathematics
issn 2227-7390
publishDate 2021-09-01
description The joint scheduling of quay cranes (QCs), yard cranes (YCs), and yard trucks (YTs) is critical to achieving good overall performance for a container terminal. However, there are only a few such integrated studies. Especially, those who have taken the vessel stowage plan (VSP) into consideration are very rare. The VSP is a plan assigning each container a stowage position in a vessel. It affects the QC operations directly and considerably. Neglecting this plan will cause problems when loading/unloading containers into/from a ship or even congest the YT and YC operations in the upstream. In this research, a framework of simulation-based optimization methods have been proposed firstly. Then, four kinds of heuristics/metaheuristics has been employed in this framework, such as sort-by-bay (SBB), genetic algorithm (GA), particle swarm optimization (PSO), and multiple groups particle swarm optimization (MGPSO), to deal with the yard crane scheduling problem (YCSP), yard truck scheduling problem (YTSP), and quay crane scheduling problem (QCSP) simultaneously for export containers, taking operational constraints into consideration. The objective aims to minimize makespan. Each of the simulation-based optimization methods includes three components, load-balancing heuristic, sequencing method, and simulation model. Experiments have been conducted to investigate the effectiveness of different simulation-based optimization methods. The results show that the MGPSO outperforms the others.
topic yard crane
yard truck
quay crane
container terminal
simulation-based optimization method
experiment
url https://www.mdpi.com/2227-7390/9/18/2236
work_keys_str_mv AT hsienpinhsu jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach
AT chiananwang jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach
AT hsinpinfu jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach
AT thanhtuandang jointschedulingofyardcraneyardtruckandquaycraneforcontainerterminalconsideringvesselstowageplananintegratedsimulationbasedoptimizationapproach
_version_ 1716870180439588864