Integrated scheduling algorithm based on the priority constraint table for complex products with tree structure
Aiming at the existing intelligent optimization algorithms for solving the integrated scheduling problem of complex products with tree structure, there are problems of missing optimal solutions when designing encoding methods or generating infeasible offspring while designing evolutionary operators,...
Main Authors: | Yilong Gao, Zhiqiang Xie, Xinyang Liu, Wei Zhou, Xu Yu |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2020-12-01
|
Series: | Advances in Mechanical Engineering |
Online Access: | https://doi.org/10.1177/1687814020985206 |
Similar Items
-
Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations
by: Zheng Zheng, et al.
Published: (2013-05-01) -
A priority-based heuristic algorithm (PBHA) for optimizing integrated process planning and scheduling problem
by: Muhammad Farhan Ausaf, et al.
Published: (2015-12-01) -
The Dynamic Priority Based Scheduling Algorithm for Hard Real-Time Heterogeneous Cmp Application
by: Man Wang, et al.
Published: (2008-09-01) -
Effects of priority rules for production scheduling on complex industrial systems
by: Helio Yochihiro Fuchigami, et al.
Published: (2016-03-01) -
Effect of Priority Class Ratios on the Novel Delay Weighted Priority Scheduling Algorithm
by: Vasco Quintyne, et al.
Published: (2010-02-01)