Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study

The construction phase is one of the very risky stages engaged in oilfields, which usually involves minor to severe human, financial, and environmental damages. It includes a major part of lost working times, and in recent years, along with the development of oilfields and oil platform construction...

Full description

Bibliographic Details
Main Authors: A. Younesi, R. Rahmani, J. Jaafari, Y. Mahdavi
Format: Article
Language:English
Published: D. G. Pylarinos 2017-06-01
Series:Engineering, Technology & Applied Science Research
Subjects:
oil
Online Access:http://etasr.com/index.php/ETASR/article/download/1127/523
id doaj-8ef8faaa6db14ed2bd9979eb20ec5619
record_format Article
spelling doaj-8ef8faaa6db14ed2bd9979eb20ec56192020-12-02T04:50:38ZengD. G. PylarinosEngineering, Technology & Applied Science Research2241-44871792-80362017-06-017316581663Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case StudyA. Younesi0R. Rahmani1J. Jaafari2Y. Mahdavi3Novo Nordisk Company, IranUrban Water and Waste Water Company, Baneh, IranDepartment of Environmental Health Engineering, School Of Public Health, Tehran University Of Medical Sciences, Tehran, IranDepartment of Environmental Health Engineering, Health Sciences Research Center, Mazandaran University Of Medical Sciences, IranThe construction phase is one of the very risky stages engaged in oilfields, which usually involves minor to severe human, financial, and environmental damages. It includes a major part of lost working times, and in recent years, along with the development of oilfields and oil platform construction activities in Iran, hazardous risks and events have occurred and have been recorded. Therefore, this study aims to reduce the negative effects of the risks engaged in oil platform construction activities in the region under study, i.e. the Abuzar oilfield. The indexing system method, along with determining the importance index, effect, and frequency of occurrence, was used in this study to evaluate the environmental risks of oil platform construction activities in Abuzar oilfield. First, the project activities were identified and then, the effect of desired activities on environmental aspects (water, air, soil, human, waste production, and noise) was investigated. For quantitative estimation of risk values through interviewing the experts and using the tables of intensity, effect, and frequency of event occurrence, were calculated based on the formula governing the effect of different activities on the environment, and the risk value was determined. The research findings indicated that most of the environmental risks are in the range of average risks (72.9%) however 20.2% are in the range of low risks and 6.9% are in the range of high risks. Finally, considering experts’ viewpoints, management solutions were proposed to reduce the risk of activities, and the risk priority numbers were calculated after performing the corrective actions.http://etasr.com/index.php/ETASR/article/download/1127/523risk assessment and managementAbuzar oilfieldoilplatformenvironment
collection DOAJ
language English
format Article
sources DOAJ
author A. Younesi
R. Rahmani
J. Jaafari
Y. Mahdavi
spellingShingle A. Younesi
R. Rahmani
J. Jaafari
Y. Mahdavi
Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
Engineering, Technology & Applied Science Research
risk assessment and management
Abuzar oilfield
oil
platform
environment
author_facet A. Younesi
R. Rahmani
J. Jaafari
Y. Mahdavi
author_sort A. Younesi
title Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
title_short Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
title_full Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
title_fullStr Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
title_full_unstemmed Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
title_sort environmental risk assessment and management in oil platform construction phase activities: a case study
publisher D. G. Pylarinos
series Engineering, Technology & Applied Science Research
issn 2241-4487
1792-8036
publishDate 2017-06-01
description The construction phase is one of the very risky stages engaged in oilfields, which usually involves minor to severe human, financial, and environmental damages. It includes a major part of lost working times, and in recent years, along with the development of oilfields and oil platform construction activities in Iran, hazardous risks and events have occurred and have been recorded. Therefore, this study aims to reduce the negative effects of the risks engaged in oil platform construction activities in the region under study, i.e. the Abuzar oilfield. The indexing system method, along with determining the importance index, effect, and frequency of occurrence, was used in this study to evaluate the environmental risks of oil platform construction activities in Abuzar oilfield. First, the project activities were identified and then, the effect of desired activities on environmental aspects (water, air, soil, human, waste production, and noise) was investigated. For quantitative estimation of risk values through interviewing the experts and using the tables of intensity, effect, and frequency of event occurrence, were calculated based on the formula governing the effect of different activities on the environment, and the risk value was determined. The research findings indicated that most of the environmental risks are in the range of average risks (72.9%) however 20.2% are in the range of low risks and 6.9% are in the range of high risks. Finally, considering experts’ viewpoints, management solutions were proposed to reduce the risk of activities, and the risk priority numbers were calculated after performing the corrective actions.
topic risk assessment and management
Abuzar oilfield
oil
platform
environment
url http://etasr.com/index.php/ETASR/article/download/1127/523
work_keys_str_mv AT ayounesi environmentalriskassessmentandmanagementinoilplatformconstructionphaseactivitiesacasestudy
AT rrahmani environmentalriskassessmentandmanagementinoilplatformconstructionphaseactivitiesacasestudy
AT jjaafari environmentalriskassessmentandmanagementinoilplatformconstructionphaseactivitiesacasestudy
AT ymahdavi environmentalriskassessmentandmanagementinoilplatformconstructionphaseactivitiesacasestudy
_version_ 1724409266496864256