JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES

Hydraulic turbine suction pipes at hydropower plants (HPPs) play an important role for providing high power indices of HPP operation. At the same time for channel type HPPs with vertical reactive hydraulic turbines curved large size suction tubes are used and this leads to great costs for their inst...

Full description

Bibliographic Details
Main Author: Bal’zannikov Mikhail Ivanovich
Format: Article
Language:English
Published: Moscow State University of Civil Engineering (MGSU) 2015-09-01
Series:Vestnik MGSU
Subjects:
Online Access:http://vestnikmgsu.ru/index.php/archive/article/download/2629
id doaj-8f50c500025541d0bc3d956422a131c5
record_format Article
spelling doaj-8f50c500025541d0bc3d956422a131c52020-11-24T22:30:08ZengMoscow State University of Civil Engineering (MGSU)Vestnik MGSU 1997-09352015-09-019111121JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPESBal’zannikov Mikhail Ivanovich0Samara State University of Architecture and Civil Engineering (SSUACE)Hydraulic turbine suction pipes at hydropower plants (HPPs) play an important role for providing high power indices of HPP operation. At the same time for channel type HPPs with vertical reactive hydraulic turbines curved large size suction tubes are used and this leads to great costs for their installation. That is why the significance of economic analysis for justification of the size of such suction pipes is underlined. Minimally possible sizes of curved pipes (height and length) are determined by hydraulic turbine normal operation requirements and are given in reference books. Nevertheless often such conditions arise when the correction of their size leading to their enlargement becomes inevitable. In particular, when there are rocks at a small depth below of the project position of the foundation slab it is feasible to increase a suction pipe’s height to place the foundation concrete on the strong rock. Or if it is necessary to make a motorway at the downstream side of a channel HPP lengthening of a suction pipe appears sensible. In such cases economic calculations are necessary on feasibility of suction pipe size change proposals. The use of an integral effect technique for such an analysis is proposed. The article provides a criterion for economic efficiency of the given technique. In conformity with it the calculations for a hydraulic turbine with 9 m diameter under acting head of 24 m are made. The calculation results are presented as graphs of dependencies of integral effect on varying parameters. The analysis of the results shows that a parameter being changed (suction pipe lengthening) has a distinct optimal value, which in the investigated variants is 2.5...3.0 m. Herewith a maximal value of economically justified hydrogenerator suction pipe lengthening satisfying the criterion adopted is in the range of 7.5...8.0 m. It is also shown that the value of the integral effect depends significantly on electric energy tariffs and the conditions of HPP operation.http://vestnikmgsu.ru/index.php/archive/article/download/2629hydropower plantsuction pipeconstructionjustification of the parametres
collection DOAJ
language English
format Article
sources DOAJ
author Bal’zannikov Mikhail Ivanovich
spellingShingle Bal’zannikov Mikhail Ivanovich
JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES
Vestnik MGSU
hydropower plant
suction pipe
construction
justification of the parametres
author_facet Bal’zannikov Mikhail Ivanovich
author_sort Bal’zannikov Mikhail Ivanovich
title JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES
title_short JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES
title_full JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES
title_fullStr JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES
title_full_unstemmed JUSTIFICATION OF THE MAIN PARAMETERS FOR HPP’S SUCTION PIPES
title_sort justification of the main parameters for hpp’s suction pipes
publisher Moscow State University of Civil Engineering (MGSU)
series Vestnik MGSU
issn 1997-0935
publishDate 2015-09-01
description Hydraulic turbine suction pipes at hydropower plants (HPPs) play an important role for providing high power indices of HPP operation. At the same time for channel type HPPs with vertical reactive hydraulic turbines curved large size suction tubes are used and this leads to great costs for their installation. That is why the significance of economic analysis for justification of the size of such suction pipes is underlined. Minimally possible sizes of curved pipes (height and length) are determined by hydraulic turbine normal operation requirements and are given in reference books. Nevertheless often such conditions arise when the correction of their size leading to their enlargement becomes inevitable. In particular, when there are rocks at a small depth below of the project position of the foundation slab it is feasible to increase a suction pipe’s height to place the foundation concrete on the strong rock. Or if it is necessary to make a motorway at the downstream side of a channel HPP lengthening of a suction pipe appears sensible. In such cases economic calculations are necessary on feasibility of suction pipe size change proposals. The use of an integral effect technique for such an analysis is proposed. The article provides a criterion for economic efficiency of the given technique. In conformity with it the calculations for a hydraulic turbine with 9 m diameter under acting head of 24 m are made. The calculation results are presented as graphs of dependencies of integral effect on varying parameters. The analysis of the results shows that a parameter being changed (suction pipe lengthening) has a distinct optimal value, which in the investigated variants is 2.5...3.0 m. Herewith a maximal value of economically justified hydrogenerator suction pipe lengthening satisfying the criterion adopted is in the range of 7.5...8.0 m. It is also shown that the value of the integral effect depends significantly on electric energy tariffs and the conditions of HPP operation.
topic hydropower plant
suction pipe
construction
justification of the parametres
url http://vestnikmgsu.ru/index.php/archive/article/download/2629
work_keys_str_mv AT balzannikovmikhailivanovich justificationofthemainparametersforhppssuctionpipes
_version_ 1725741770243833856