A Branch and Bound Algorithm and Iterative Reordering Strategies for Inserting Additional Trains in Real Time: A Case Study in Germany
With the aim of supporting the process of adapting railway infrastructure and future traffic needs, we have developed a method to insert additional trains efficiently to an existing timetable without introducing large consecutive delays to scheduled trains. In this work, the problem is characterized...
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2015-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2015/289072 |