A New Mathematical Model for Simultaneous Lot-sizing and Production Scheduling Problems Considering Earliness/Tardiness Penalties and Setup Costs
This paper investigated the problem of simultaneous determination of lot-sizing and production scheduling with earliness/tardiness penalties. In this problem, decisions about lot-sizing and scheduling are made so that the sum of holding, tardiness, and setup costs is minimized. There are n orders wa...
Main Author: | Parinaz Vaez |
---|---|
Format: | Article |
Language: | English |
Published: |
Kharazmi University
2017-05-01
|
Series: | International Journal of Supply and Operations Management |
Subjects: | |
Online Access: | http://www.ijsom.com/article_2731_6192678db270ee2c1f52721aca1ff6b1.pdf |
Similar Items
-
Minimizing Tardiness Penalty Costs in Job Shop Scheduling Under Maximum Allowable Tardiness
by: Jae-Gon Kim, et al.
Published: (2020-11-01) -
A Novel Ant Colony Algorithm for the Single-Machine Total Weighted Tardiness Problem with Sequence Dependent Setup Times
by: Fardin Ahmadizar, et al.
Published: (2011-08-01) -
Lot size scheduling problem with two level setup cost/time structure
by: Chung, Jae Hyun
Published: (2008) -
Simultaneous selection and scheduling with sequence-dependent setup times, lateness penalties, and machine availability constraint: Heuristic approaches
by: Mohammad Hossein Zarei, et al.
Published: (2016-01-01) -
An effective hybrid ant lion algorithm to minimize mean tardiness on permutation flow shop scheduling problem
by: Dana Marsetiya Utama, et al.
Published: (2020-03-01)