Compensation of 110 kV Cable Lines – Possibilities and Limitations

This paper discusses problems of the compensation of 110 kV cable lines tens of kilometres long. Such lines are currently built primarily to connect a wind farm, as a consequence of the difficulties in obtaining permits for overhead line construction. Practical design problems derive from the fact o...

Full description

Bibliographic Details
Main Authors: Piotr Kacejko, Paweł Pijarski, Sylwester Adamek
Format: Article
Language:English
Published: ENERGA SA 2015-09-01
Series:Acta Energetica
Subjects:
Online Access:http://actaenergetica.org/en/articles/acta-energetica-032015/compensation-of-110-kv-cable-lines-%E2%80%93-possibilities-and-limitations/
id doaj-9382c9af346945e491d6c96baa56816b
record_format Article
spelling doaj-9382c9af346945e491d6c96baa56816b2020-11-24T23:39:57ZengENERGA SAActa Energetica2300-30222015-09-01243263310.12736/issn.2300-3022.2015303Compensation of 110 kV Cable Lines – Possibilities and LimitationsPiotr Kacejko0Paweł Pijarski1Sylwester Adamek2Lublin University of TechnologyLublin University of TechnologyLublin University of TechnologyThis paper discusses problems of the compensation of 110 kV cable lines tens of kilometres long. Such lines are currently built primarily to connect a wind farm, as a consequence of the difficulties in obtaining permits for overhead line construction. Practical design problems derive from the fact of an undetermined cable capacitance and choke reactance (individually manufactured custom devices) and the voltage variation at the interconnection point. With a probabilistic approach possible solutions are suggested for selecting compensation devices.http://actaenergetica.org/en/articles/acta-energetica-032015/compensation-of-110-kv-cable-lines-%E2%80%93-possibilities-and-limitations/reactive power compensationwind farm
collection DOAJ
language English
format Article
sources DOAJ
author Piotr Kacejko
Paweł Pijarski
Sylwester Adamek
spellingShingle Piotr Kacejko
Paweł Pijarski
Sylwester Adamek
Compensation of 110 kV Cable Lines – Possibilities and Limitations
Acta Energetica
reactive power compensation
wind farm
author_facet Piotr Kacejko
Paweł Pijarski
Sylwester Adamek
author_sort Piotr Kacejko
title Compensation of 110 kV Cable Lines – Possibilities and Limitations
title_short Compensation of 110 kV Cable Lines – Possibilities and Limitations
title_full Compensation of 110 kV Cable Lines – Possibilities and Limitations
title_fullStr Compensation of 110 kV Cable Lines – Possibilities and Limitations
title_full_unstemmed Compensation of 110 kV Cable Lines – Possibilities and Limitations
title_sort compensation of 110 kv cable lines – possibilities and limitations
publisher ENERGA SA
series Acta Energetica
issn 2300-3022
publishDate 2015-09-01
description This paper discusses problems of the compensation of 110 kV cable lines tens of kilometres long. Such lines are currently built primarily to connect a wind farm, as a consequence of the difficulties in obtaining permits for overhead line construction. Practical design problems derive from the fact of an undetermined cable capacitance and choke reactance (individually manufactured custom devices) and the voltage variation at the interconnection point. With a probabilistic approach possible solutions are suggested for selecting compensation devices.
topic reactive power compensation
wind farm
url http://actaenergetica.org/en/articles/acta-energetica-032015/compensation-of-110-kv-cable-lines-%E2%80%93-possibilities-and-limitations/
work_keys_str_mv AT piotrkacejko compensationof110kvcablelinespossibilitiesandlimitations
AT pawełpijarski compensationof110kvcablelinespossibilitiesandlimitations
AT sylwesteradamek compensationof110kvcablelinespossibilitiesandlimitations
_version_ 1725511653260263424