‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS

With the growth in customers’ demand diversification, mixed-model U-lines (MMUL) have acquired increasing importance in the area of assembly systems. There are generally two different approaches in the literature for balancing such systems. Some researchers believe that since the types of models can...

Full description

Bibliographic Details
Main Authors: Masoud Rabbani, Zohreh Zahedian-Tejenaki, Farnoush Otrody, Amir Farshbaf-Geranmyeh
Format: Article
Language:English
Published: Islamic Azad University 2016-03-01
Series:International Journal of Mathematical Modelling & Computations
Subjects:
Online Access:http://ijm2c.iauctb.ac.ir/article_521907_d6fed473bc0cf6223d0cd6c74ff229ea.pdf
id doaj-944c7ac0826c419ba3b29337799415ab
record_format Article
spelling doaj-944c7ac0826c419ba3b29337799415ab2021-05-05T13:58:48ZengIslamic Azad UniversityInternational Journal of Mathematical Modelling & Computations2228-62252228-62332016-03-0161 (WINTER)117521907‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSISMasoud Rabbani0Zohreh Zahedian-Tejenaki1Farnoush Otrody2Amir Farshbaf-Geranmyeh3College of Engineering, University of Tehran Iran, Islamic Republic of Industrial EngineeringSchool of Industrial Engineering, College of Engineering, University of Tehran Iran, Islamic Republic ofSchool of Industrial Engineering, College of Engineering, University of Tehran Iran, Islamic Republic ofSchool of Industrial Engineering, College of Engineering, University of Tehran Iran, Islamic Republic ofWith the growth in customers’ demand diversification, mixed-model U-lines (MMUL) have acquired increasing importance in the area of assembly systems. There are generally two different approaches in the literature for balancing such systems. Some researchers believe that since the types of models can be very diverse, a balancing approach without simultaneously sequencing of models will not yield an optimum configuration. On the other hand, another group of researchers point to the high cost of balancing systems and prefer to do it only one time regardless of the models’ sequences. In this paper, we aim to compare these two approaches by introducing an economic indicator. To do so, two models as representatives of the two different viewpoints are taken from the literature. To check the validity of this methodology, it is implemented by Lingo 11.0, for small scale, and GA, for a large scale. The obtained results indicate that, from the proposed economic indicator point of view, mixed-model U-lines balancing and sequencing (MMUL/BS) is preferred to its counterpart, mixed-model U-lines balancing (MMULB). This paper offers economic guidelines for managers to choose between only balancing and implementing it by sequencing at the same time.http://ijm2c.iauctb.ac.ir/article_521907_d6fed473bc0cf6223d0cd6c74ff229ea.pdfmixed model u-linesassembly line balancingassembly line balancing and sequencingcost indexgenetic algorithm
collection DOAJ
language English
format Article
sources DOAJ
author Masoud Rabbani
Zohreh Zahedian-Tejenaki
Farnoush Otrody
Amir Farshbaf-Geranmyeh
spellingShingle Masoud Rabbani
Zohreh Zahedian-Tejenaki
Farnoush Otrody
Amir Farshbaf-Geranmyeh
‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
International Journal of Mathematical Modelling & Computations
mixed model u-lines
assembly line balancing
assembly line balancing and sequencing
cost index
genetic algorithm
author_facet Masoud Rabbani
Zohreh Zahedian-Tejenaki
Farnoush Otrody
Amir Farshbaf-Geranmyeh
author_sort Masoud Rabbani
title ‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
title_short ‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
title_full ‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
title_fullStr ‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
title_full_unstemmed ‘BALANCING AND SEQUENCING’ VERSUS ‘ONLY BALANCING’ IN MIXED MODEL U-LINE ASSEMBLY SYSTEMS: AN ECONOMIC ANALYSIS
title_sort ‘balancing and sequencing’ versus ‘only balancing’ in mixed model u-line assembly systems: an economic analysis
publisher Islamic Azad University
series International Journal of Mathematical Modelling & Computations
issn 2228-6225
2228-6233
publishDate 2016-03-01
description With the growth in customers’ demand diversification, mixed-model U-lines (MMUL) have acquired increasing importance in the area of assembly systems. There are generally two different approaches in the literature for balancing such systems. Some researchers believe that since the types of models can be very diverse, a balancing approach without simultaneously sequencing of models will not yield an optimum configuration. On the other hand, another group of researchers point to the high cost of balancing systems and prefer to do it only one time regardless of the models’ sequences. In this paper, we aim to compare these two approaches by introducing an economic indicator. To do so, two models as representatives of the two different viewpoints are taken from the literature. To check the validity of this methodology, it is implemented by Lingo 11.0, for small scale, and GA, for a large scale. The obtained results indicate that, from the proposed economic indicator point of view, mixed-model U-lines balancing and sequencing (MMUL/BS) is preferred to its counterpart, mixed-model U-lines balancing (MMULB). This paper offers economic guidelines for managers to choose between only balancing and implementing it by sequencing at the same time.
topic mixed model u-lines
assembly line balancing
assembly line balancing and sequencing
cost index
genetic algorithm
url http://ijm2c.iauctb.ac.ir/article_521907_d6fed473bc0cf6223d0cd6c74ff229ea.pdf
work_keys_str_mv AT masoudrabbani balancingandsequencingversusonlybalancinginmixedmodelulineassemblysystemsaneconomicanalysis
AT zohrehzahediantejenaki balancingandsequencingversusonlybalancinginmixedmodelulineassemblysystemsaneconomicanalysis
AT farnoushotrody balancingandsequencingversusonlybalancinginmixedmodelulineassemblysystemsaneconomicanalysis
AT amirfarshbafgeranmyeh balancingandsequencingversusonlybalancinginmixedmodelulineassemblysystemsaneconomicanalysis
_version_ 1721460511081496576