Analysis on Treatment Effect of Mine Tunnel Construction Spring in Karst Area
The investigation of ultrashallow buried mining method in an interval revealed the existence of the karst fracture zone. The flow rate of 9 springs exposed in the initial excavation was relatively large, and the total water output per hour was nearly 300 m3. The filling materials in karst channels o...
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Hindawi Limited
2021-01-01
|
Series: | Mathematical Problems in Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/5585054 |