Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid

Resumen En el año 2014, A nivel europeo, la Directiva 2014/24/UE sobre contratación pública establece la necesidad de emplear sistemas electrónicos (medios de comunicación y herramientas para modelar los datos del edificio) en procesos de contratación de obras, servicios y suministros. En España el...

Full description

Bibliographic Details
Main Authors: Rafael Vicente Lozano-Díez, Oscar López Zaldivar, Sofia Herrero del Cura, Pablo Luis Mayor Lobo
Format: Article
Language:English
Published: Universidad Politécnica de Madrid 2018-04-01
Series:Advances in Building Education
Subjects:
Online Access:http://polired.upm.es/index.php/abe/article/view/3697
id doaj-968b839246e640cc87438ad1187cc5b6
record_format Article
collection DOAJ
language English
format Article
sources DOAJ
author Rafael Vicente Lozano-Díez
Oscar López Zaldivar
Sofia Herrero del Cura
Pablo Luis Mayor Lobo
spellingShingle Rafael Vicente Lozano-Díez
Oscar López Zaldivar
Sofia Herrero del Cura
Pablo Luis Mayor Lobo
Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid
Advances in Building Education
Implantación BIM
Grado en Edificación
Innovación Educativa
Enseñanza BIM
BIM implementation, Building Degree, Educational innovation, BIM teaching
author_facet Rafael Vicente Lozano-Díez
Oscar López Zaldivar
Sofia Herrero del Cura
Pablo Luis Mayor Lobo
author_sort Rafael Vicente Lozano-Díez
title Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid
title_short Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid
title_full Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid
title_fullStr Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid
title_full_unstemmed Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de Madrid
title_sort primeras experiencias en formación reglada del entorno bim: el caso del grado en edificación de la universidad politécnica de madrid = first formal training experiences in the bim environment. the case of the degree in building in the universidad politécnica de madrid
publisher Universidad Politécnica de Madrid
series Advances in Building Education
issn 2530-7940
publishDate 2018-04-01
description Resumen En el año 2014, A nivel europeo, la Directiva 2014/24/UE sobre contratación pública establece la necesidad de emplear sistemas electrónicos (medios de comunicación y herramientas para modelar los datos del edificio) en procesos de contratación de obras, servicios y suministros. En España el Ministerio de Fomento, quien a través de su comisión BIM, ha establecido que a partir de diciembre de 2018 los edificios públicos y julio de 2019 las infraestructuras de titularidad pública, se proyecten conforme a la metodología BIM. Con este planeamiento y calendario resultaba imprescindible dar respuesta desde la Universidad implementando nuevas disciplinas, o adaptando las existentes, que dieran como resultado la adquisición de habilidades y competencias necesarias para la correcta formación de los futuros profesionales, tal y como se demanda en diferentes universidades europeas. Por este motivo, ese mismo año, desde el departamento de Tecnología de Edificación de la ETS de Edificación, ante la dificultad para modificar el plan de estudios, de adaptar de forma inmediata disciplinas ya existentes y/o establecer una rigurosa y comprometida formación de docentes, a nivel casi individual de los profesores firmantes de la presente, se propone una nueva asignatura optativa que permitiera a los alumnos interesados iniciarse en la metodología de trabajo BIM. Una vez puesta en marcha la asignatura y como única reglada en el ámbito, nuestro objetivo está claro. El estudio sobre su implantación en el alumnado y su grado de satisfacción; el cumplimiento de la finalidad para la que fue creada, así como contemplar las diferentes propuestas de los propios alumnos al respecto de su intensificación docente. Los resultados obtenidos son altamente satisfactorios y anuncian una muy alta necesidad demandada por los propios alumnos al respecto de intensificar e incorporar la docencia BIM como herramienta esencial para sus estudios y posterior desarrollo profesional. Abstract Directive 2014/24 / EU on public procurement establishes in 2014 at European level the need to use electronic systems (means of communication and tools to model building data) in contracting procedures of building works, services and supplies. In Spain, the Ministry of Development has established through its BIM commission, that as of December 2018 and July 2019, both public buildings and infrastructures under public ownership respectively, are projected in accordance with the BIM methodology. Under this schedule it was essential for the Spanish University to respond by implementing new disciplines, or adapting the existing ones, to achieve skills and competencies for the proper training of future professionals, as it is demanded in other European universities. For this reason, the Department of Building Technology of the ETS Edificación (Universidad Politécnica de Madrid), faced the difficulties of adapting existing disciplines and established a rigorous teacher training method, at an almost individual level. It was proposed a new optional subject that would allow interested students to get started on the BIM work methodology. This experience has been the only formal training established in the School of Building in the field of BIM. Once implemented, our first objective is clear: To study its level of implementation and to gauge the level of satisfaction among the students. In other words: To discuss the fulfillment of the purpose for which it was created, as well as to study different proposals regarding teaching intensification made by the students themselves. The results obtained are highly satisfactory and announce a very high demand by the students in order to intensify and incorporate BIM teaching as an essential tool for their studies and their professional development.
topic Implantación BIM
Grado en Edificación
Innovación Educativa
Enseñanza BIM
BIM implementation, Building Degree, Educational innovation, BIM teaching
url http://polired.upm.es/index.php/abe/article/view/3697
work_keys_str_mv AT rafaelvicentelozanodiez primerasexperienciasenformacionregladadelentornobimelcasodelgradoenedificaciondelauniversidadpolitecnicademadridfirstformaltrainingexperiencesinthebimenvironmentthecaseofthedegreeinbuildingintheuniversidadpolitecnicademadrid
AT oscarlopezzaldivar primerasexperienciasenformacionregladadelentornobimelcasodelgradoenedificaciondelauniversidadpolitecnicademadridfirstformaltrainingexperiencesinthebimenvironmentthecaseofthedegreeinbuildingintheuniversidadpolitecnicademadrid
AT sofiaherrerodelcura primerasexperienciasenformacionregladadelentornobimelcasodelgradoenedificaciondelauniversidadpolitecnicademadridfirstformaltrainingexperiencesinthebimenvironmentthecaseofthedegreeinbuildingintheuniversidadpolitecnicademadrid
AT pabloluismayorlobo primerasexperienciasenformacionregladadelentornobimelcasodelgradoenedificaciondelauniversidadpolitecnicademadridfirstformaltrainingexperiencesinthebimenvironmentthecaseofthedegreeinbuildingintheuniversidadpolitecnicademadrid
_version_ 1716824221615652864
spelling doaj-968b839246e640cc87438ad1187cc5b62020-11-24T20:41:41ZengUniversidad Politécnica de Madrid Advances in Building Education2530-79402018-04-012110912110.20868/abe.2018.1.36973568Primeras experiencias en formación reglada del entorno BIM: El caso del Grado en Edificación de la Universidad Politécnica de Madrid = First formal training experiences in the BIM environment. The case of the Degree in Building in the Universidad Politécnica de MadridRafael Vicente Lozano-Díez0Oscar López Zaldivar1Sofia Herrero del Cura2Pablo Luis Mayor Lobo3Departamento de Tecnología de la Edificación, Universidad Politécnica de MadridDepartamento de Tecnología de la Edificación, Universidad Politécnica de MadridDepartamento de Tecnología de la Edificación, Universidad Politécnica de MadridDepartamento de Tecnología de la Edificación, Universidad Politécnica de MadridResumen En el año 2014, A nivel europeo, la Directiva 2014/24/UE sobre contratación pública establece la necesidad de emplear sistemas electrónicos (medios de comunicación y herramientas para modelar los datos del edificio) en procesos de contratación de obras, servicios y suministros. En España el Ministerio de Fomento, quien a través de su comisión BIM, ha establecido que a partir de diciembre de 2018 los edificios públicos y julio de 2019 las infraestructuras de titularidad pública, se proyecten conforme a la metodología BIM. Con este planeamiento y calendario resultaba imprescindible dar respuesta desde la Universidad implementando nuevas disciplinas, o adaptando las existentes, que dieran como resultado la adquisición de habilidades y competencias necesarias para la correcta formación de los futuros profesionales, tal y como se demanda en diferentes universidades europeas. Por este motivo, ese mismo año, desde el departamento de Tecnología de Edificación de la ETS de Edificación, ante la dificultad para modificar el plan de estudios, de adaptar de forma inmediata disciplinas ya existentes y/o establecer una rigurosa y comprometida formación de docentes, a nivel casi individual de los profesores firmantes de la presente, se propone una nueva asignatura optativa que permitiera a los alumnos interesados iniciarse en la metodología de trabajo BIM. Una vez puesta en marcha la asignatura y como única reglada en el ámbito, nuestro objetivo está claro. El estudio sobre su implantación en el alumnado y su grado de satisfacción; el cumplimiento de la finalidad para la que fue creada, así como contemplar las diferentes propuestas de los propios alumnos al respecto de su intensificación docente. Los resultados obtenidos son altamente satisfactorios y anuncian una muy alta necesidad demandada por los propios alumnos al respecto de intensificar e incorporar la docencia BIM como herramienta esencial para sus estudios y posterior desarrollo profesional. Abstract Directive 2014/24 / EU on public procurement establishes in 2014 at European level the need to use electronic systems (means of communication and tools to model building data) in contracting procedures of building works, services and supplies. In Spain, the Ministry of Development has established through its BIM commission, that as of December 2018 and July 2019, both public buildings and infrastructures under public ownership respectively, are projected in accordance with the BIM methodology. Under this schedule it was essential for the Spanish University to respond by implementing new disciplines, or adapting the existing ones, to achieve skills and competencies for the proper training of future professionals, as it is demanded in other European universities. For this reason, the Department of Building Technology of the ETS Edificación (Universidad Politécnica de Madrid), faced the difficulties of adapting existing disciplines and established a rigorous teacher training method, at an almost individual level. It was proposed a new optional subject that would allow interested students to get started on the BIM work methodology. This experience has been the only formal training established in the School of Building in the field of BIM. Once implemented, our first objective is clear: To study its level of implementation and to gauge the level of satisfaction among the students. In other words: To discuss the fulfillment of the purpose for which it was created, as well as to study different proposals regarding teaching intensification made by the students themselves. The results obtained are highly satisfactory and announce a very high demand by the students in order to intensify and incorporate BIM teaching as an essential tool for their studies and their professional development.http://polired.upm.es/index.php/abe/article/view/3697Implantación BIMGrado en EdificaciónInnovación EducativaEnseñanza BIMBIM implementation, Building Degree, Educational innovation, BIM teaching