This paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressur...
Main Authors: | , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
De Gruyter
2015-12-01
|
Series: | Open Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/eng.2015.5.issue-1/eng-2015-0048/eng-2015-0048.xml?format=INT |
id |
doaj-96cc60b5a8184b84a8e086f050a70d57 |
---|---|
record_format |
Article |
spelling |
doaj-96cc60b5a8184b84a8e086f050a70d572020-11-25T00:41:47ZengDe GruyterOpen Engineering2391-54392015-12-015110.1515/eng-2015-0048eng-2015-0048Technical aspects of a large size industrial process turbo compressor revampŚwider Piotr0Kozanecki Jr Zbigniew1Graczykowski Marek2Kryłłowicz Władysław3NEO-TEC LTD., Kobiałka 11a, 09-411 Płock, PolandNEO-TEC LTD., Kobiałka 11a, 09-411 Płock, PolandPKN ORLEN S.A., Chemików 7, 09-411 Płock, PolandLodz University of Technology, Institute of Turbo machinery, Wólczańska 219/223, 93-005 Lódź, PolandThis paper describes several modernization aspects of the process 8 MW air compressor and its driver. The main aim of the revamp was to increase internal efficiencies of both the compressor and turbine and increase the load of the compressor without additional power consumption. The original pressure ratio was preserved. To meet these requirements a redesign of the flow path of both machineswas necessary.Moreover, the turbineworking conditions were changed from extraction-condensing to condensing. In terms of compressor, impeller blade redesign, adaptation of diffusers and Abradable seals were a part of the scope. The revamp was completed in April 2014 with all the requirements met. This paper covers the general outline and a comparison of the original and modernized machine operating parameters, design and technical assumptions and also describes some problematic issues which occurred during the realization of the project.http://www.degruyter.com/view/j/eng.2015.5.issue-1/eng-2015-0048/eng-2015-0048.xml?format=INTProcess compressor Turbine Impeller Revamp |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Świder Piotr Kozanecki Jr Zbigniew Graczykowski Marek Kryłłowicz Władysław |
spellingShingle |
Świder Piotr Kozanecki Jr Zbigniew Graczykowski Marek Kryłłowicz Władysław Technical aspects of a large size industrial process turbo compressor revamp Open Engineering Process compressor Turbine Impeller Revamp |
author_facet |
Świder Piotr Kozanecki Jr Zbigniew Graczykowski Marek Kryłłowicz Władysław |
author_sort |
Świder Piotr |
title |
Technical aspects of a large size industrial
process turbo compressor revamp |
title_short |
Technical aspects of a large size industrial
process turbo compressor revamp |
title_full |
Technical aspects of a large size industrial
process turbo compressor revamp |
title_fullStr |
Technical aspects of a large size industrial
process turbo compressor revamp |
title_full_unstemmed |
Technical aspects of a large size industrial
process turbo compressor revamp |
title_sort |
technical aspects of a large size industrial
process turbo compressor revamp |
publisher |
De Gruyter |
series |
Open Engineering |
issn |
2391-5439 |
publishDate |
2015-12-01 |
description |
This paper describes several modernization aspects
of the process 8 MW air compressor and its driver.
The main aim of the revamp was to increase internal efficiencies
of both the compressor and turbine and increase
the load of the compressor without additional power consumption.
The original pressure ratio was preserved. To
meet these requirements a redesign of the flow path of
both machineswas necessary.Moreover, the turbineworking
conditions were changed from extraction-condensing
to condensing. In terms of compressor, impeller blade redesign,
adaptation of diffusers and Abradable seals were
a part of the scope.
The revamp was completed in April 2014 with all the requirements
met. This paper covers the general outline and
a comparison of the original and modernized machine
operating parameters, design and technical assumptions
and also describes some problematic issues which occurred
during the realization of the project. |
topic |
Process compressor Turbine Impeller Revamp |
url |
http://www.degruyter.com/view/j/eng.2015.5.issue-1/eng-2015-0048/eng-2015-0048.xml?format=INT |
work_keys_str_mv |
AT swiderpiotr technicalaspectsofalargesizeindustrialprocessturbocompressorrevamp AT kozaneckijrzbigniew technicalaspectsofalargesizeindustrialprocessturbocompressorrevamp AT graczykowskimarek technicalaspectsofalargesizeindustrialprocessturbocompressorrevamp AT kryłłowiczwładysław technicalaspectsofalargesizeindustrialprocessturbocompressorrevamp |
_version_ |
1725285613161152512 |