Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)

Malaysia is making an aggressive effort of transformation to become a fully developed country. As one of the pillars for transformation, the construction industry has been undergoing a major reform with regard to the traditional method of construction. In recent years, the Industrialised Building S...

Full description

Bibliographic Details
Main Authors: Hamizah Liyana Tajul Ariffin, Norhazren Izatie Mohd, Nur Emma Mustaffa, Shamsulhadi Bandi, Cecelia Ho Mei Chee
Format: Article
Language:English
Published: Universiti Teknologi Malaysia 2019-01-01
Series:International Journal of Built Environment and Sustainability
Subjects:
ibs
Online Access:https://ijbes.utm.my/index.php/ijbes/article/view/328
id doaj-9c67b54be9444e9bbb6d348497468e86
record_format Article
spelling doaj-9c67b54be9444e9bbb6d348497468e862020-11-25T02:44:00ZengUniversiti Teknologi MalaysiaInternational Journal of Built Environment and Sustainability2289-89482289-89482019-01-01611510.11113/ijbes.v6.n1.328Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)Hamizah Liyana Tajul Ariffin0Norhazren Izatie Mohd1 Nur Emma Mustaffa2Shamsulhadi Bandi3Cecelia Ho Mei Chee4Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia Department of Quantity Surveying, Faculty of Built Environment and Surveying, Universiti Teknologi Malaysia, 81310 UTM Johor Bahru, Johor, Malaysia Malaysia is making an aggressive effort of transformation to become a fully developed country. As one of the pillars for transformation, the construction industry has been undergoing a major reform with regard to the traditional method of construction. In recent years, the Industrialised Building System (IBS) has been promoted extensively with the government taking a lead with the practice. Studies showed that IBS has been able to expedite construction process, improve the time taken to accomplish a project, improve building quality, able to control cost and human resources, which in overall, raise occupational health and safety standard of construction. Despite, as most IBS projects were carried out under the traditional procurement method, the full benefits of IBS are somehow obscured. Several issues such as work delay, lack of communication and integration, lack of knowledge and an increase in cost, which are synonymous to the traditional procurement method appear to outweigh the benefit of IBS. Hence, this research aims to suggest an alternative to the traditional procurement method with regard to IBS project implementation. The focus of this research has been on the challenges and innovative procurement methods most suited for IBS project. Two objectives were outlined: (1) to identify issues faced by the client on current procurement method in IBS project; and (2) to identify the client’s perspective on innovative procurement method most suited for IBS project. Data for this research was collected through semi-structured interviews with five respondents from five major developers having experience in IBS project implementation. The results from the thematic analysis revealed that apart from the common issues which ascend from the sequential nature of the traditional procurement method, design integration issue was opined to aggravate the situation. Unanimously, respondents agreed that partnering is the way forward for IBS project implementation in the Malaysian construction industry. This research contributes by providing important pointers for the local construction industry to move forward with IBS project implementation. https://ijbes.utm.my/index.php/ijbes/article/view/328ibstraditional procurement methodissuesclient’s perspectiveinnovative procurement
collection DOAJ
language English
format Article
sources DOAJ
author Hamizah Liyana Tajul Ariffin
Norhazren Izatie Mohd
Nur Emma Mustaffa
Shamsulhadi Bandi
Cecelia Ho Mei Chee
spellingShingle Hamizah Liyana Tajul Ariffin
Norhazren Izatie Mohd
Nur Emma Mustaffa
Shamsulhadi Bandi
Cecelia Ho Mei Chee
Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
International Journal of Built Environment and Sustainability
ibs
traditional procurement method
issues
client’s perspective
innovative procurement
author_facet Hamizah Liyana Tajul Ariffin
Norhazren Izatie Mohd
Nur Emma Mustaffa
Shamsulhadi Bandi
Cecelia Ho Mei Chee
author_sort Hamizah Liyana Tajul Ariffin
title Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
title_short Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
title_full Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
title_fullStr Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
title_full_unstemmed Perspectives on issues and the application of the innovative procurement approaches for the Industrialised Building System (IBS)
title_sort perspectives on issues and the application of the innovative procurement approaches for the industrialised building system (ibs)
publisher Universiti Teknologi Malaysia
series International Journal of Built Environment and Sustainability
issn 2289-8948
2289-8948
publishDate 2019-01-01
description Malaysia is making an aggressive effort of transformation to become a fully developed country. As one of the pillars for transformation, the construction industry has been undergoing a major reform with regard to the traditional method of construction. In recent years, the Industrialised Building System (IBS) has been promoted extensively with the government taking a lead with the practice. Studies showed that IBS has been able to expedite construction process, improve the time taken to accomplish a project, improve building quality, able to control cost and human resources, which in overall, raise occupational health and safety standard of construction. Despite, as most IBS projects were carried out under the traditional procurement method, the full benefits of IBS are somehow obscured. Several issues such as work delay, lack of communication and integration, lack of knowledge and an increase in cost, which are synonymous to the traditional procurement method appear to outweigh the benefit of IBS. Hence, this research aims to suggest an alternative to the traditional procurement method with regard to IBS project implementation. The focus of this research has been on the challenges and innovative procurement methods most suited for IBS project. Two objectives were outlined: (1) to identify issues faced by the client on current procurement method in IBS project; and (2) to identify the client’s perspective on innovative procurement method most suited for IBS project. Data for this research was collected through semi-structured interviews with five respondents from five major developers having experience in IBS project implementation. The results from the thematic analysis revealed that apart from the common issues which ascend from the sequential nature of the traditional procurement method, design integration issue was opined to aggravate the situation. Unanimously, respondents agreed that partnering is the way forward for IBS project implementation in the Malaysian construction industry. This research contributes by providing important pointers for the local construction industry to move forward with IBS project implementation.
topic ibs
traditional procurement method
issues
client’s perspective
innovative procurement
url https://ijbes.utm.my/index.php/ijbes/article/view/328
work_keys_str_mv AT hamizahliyanatajulariffin perspectivesonissuesandtheapplicationoftheinnovativeprocurementapproachesfortheindustrialisedbuildingsystemibs
AT norhazrenizatiemohd perspectivesonissuesandtheapplicationoftheinnovativeprocurementapproachesfortheindustrialisedbuildingsystemibs
AT nuremmamustaffa perspectivesonissuesandtheapplicationoftheinnovativeprocurementapproachesfortheindustrialisedbuildingsystemibs
AT shamsulhadibandi perspectivesonissuesandtheapplicationoftheinnovativeprocurementapproachesfortheindustrialisedbuildingsystemibs
AT ceceliahomeichee perspectivesonissuesandtheapplicationoftheinnovativeprocurementapproachesfortheindustrialisedbuildingsystemibs
_version_ 1724768104732426240