Multivariate Information Dynamic Monitoring System Application of Tunnel Construction Process Model Test
Geomechnical model testing has been widely applied as a kind of research technique in underground engineering problems. However, during the practical application process, due to the influence of many factors, the desired results cannot be obtained. In order to solve this problem, based on the measur...
Main Authors: | Liu Q., Chen J., Wei L., Huang P., Luo Y., Pu X. |
---|---|
Format: | Article |
Language: | English |
Published: |
Sciendo
2016-09-01
|
Series: | Archives of Civil Engineering |
Subjects: | |
Online Access: | http://www.degruyter.com/view/j/ace.2016.62.issue-3/ace-2015-0087/ace-2015-0087.xml?format=INT |
Similar Items
-
Prototype test study on dynamic stress of utility tunnel under traffic load
by: Lianzi Jiang, et al.
Published: (2020-02-01) -
On the Monitoring Complex Multivariate Processes
by: Angelina Rajda-Tasior, et al.
Published: (2016-12-01) -
Geomonitoring in construction of the tunnel
by: Jozef Čížik, et al.
Published: (2008-12-01) -
Wind tunnel test for guyed mast dynamic characteristics under wind loads
by: Zhu, Ningli
Published: (2007) -
Research of Tunnel Construction Monitoring System Base on Senor Information Fusion
by: Kaisheng Zhang, et al.
Published: (2014-05-01)