Analysis of the BP-150M barrier carrying capacity according to MLC standards

The article includes an analysis of the possibility of a temporary combined crossing using the DMS-65 bridge construction and the BP-150M floating barge support. In order to shorten the construction time of the crossing, traditional floating supports are replaced. Examples of nomograms were develope...

Full description

Bibliographic Details
Main Authors: Jan Marszałek, Mieczysław Piechota, Bartłomiej Wójtowicz
Format: Article
Language:English
Published: Wojskowa Akademia Techniczna, Redakcja Wydawnictw WAT, ul. gen. S. Kaliskiego 2, 00-908 Warszawa 2017-09-01
Series:Biuletyn Wojskowej Akademii Technicznej
Subjects:
Online Access:http://biuletynwat.pl/gicid/01.3001.0010.5395
Description
Summary:The article includes an analysis of the possibility of a temporary combined crossing using the DMS-65 bridge construction and the BP-150M floating barge support. In order to shorten the construction time of the crossing, traditional floating supports are replaced. Examples of nomograms were developed, using the method of a compensation function of moments at supports. Load analysis according to MLC standards has made it possible to determine the parameters of crossing over the Abrams M1A2 tank bridge. Keywords: building engineering, folding bridges, floating supports
ISSN:1234-5865