Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice

Objectives : This research evaluate the level of construction waste materials in Iraq construction industry and compare construction material waste among three types of executing projects including specialist contractors, general building contractor and government department. Methods : The target...

Full description

Bibliographic Details
Main Author: Ali Hussain
Format: Article
Language:English
Published: Korean Society of Environmental Engineers 2021-06-01
Series:대한환경공학회지
Subjects:
Online Access:https://www.jksee.or.kr/journal/view.php?number=4346
id doaj-a1100b24d8374283a4c6895d731faf37
record_format Article
spelling doaj-a1100b24d8374283a4c6895d731faf372021-07-27T02:31:47ZengKorean Society of Environmental Engineers대한환경공학회지1225-50252383-78102021-06-0143645346010.4491/KSEE.2021.43.6.453Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client PracticeAli Hussain0https://orcid.org/0000-0002-3291-7943Building Engineering Department, Education of Thiqar DirectorateObjectives : This research evaluate the level of construction waste materials in Iraq construction industry and compare construction material waste among three types of executing projects including specialist contractors, general building contractor and government department. Methods : The target materials in this study were brick, cement, sand, steel, gravel and thermo-stone. SPSS V24. Descriptive and inferential analyses were applied in this study. Results and Discussion : Field observation show that the highest percentage of waste was “Brick” with 15.21% followed by “Sand” with 12.52% and “Thermo-stone” with 12.02%. The lowest percentage of waste in Iraq construction project was “Steel” and “Cement” with 3.96% and 4% respectively. The results of a comparison between these three groups confirmed that for all types of construction project waste, the governmental project had the highest percentage (12.77%), special contractor (11.19%), a general building contractor (9.71%). The major waste from materials was handling with 31.9%, concrete construction with 28.09% and 24.26% the finishing. Conclusion : The percentage of losses in the construction sites is very high compared to the permissible limit implementing inexpensive preventive measures, mostly related to managerial practice improvements.https://www.jksee.or.kr/journal/view.php?number=4346construction materialconstruction wastebuilding
collection DOAJ
language English
format Article
sources DOAJ
author Ali Hussain
spellingShingle Ali Hussain
Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
대한환경공학회지
construction material
construction waste
building
author_facet Ali Hussain
author_sort Ali Hussain
title Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
title_short Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
title_full Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
title_fullStr Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
title_full_unstemmed Evaluating Waste Material Among Construction Project: Identify Reason Waste and Suggestion Improvement Designer, Contractor and Client Practice
title_sort evaluating waste material among construction project: identify reason waste and suggestion improvement designer, contractor and client practice
publisher Korean Society of Environmental Engineers
series 대한환경공학회지
issn 1225-5025
2383-7810
publishDate 2021-06-01
description Objectives : This research evaluate the level of construction waste materials in Iraq construction industry and compare construction material waste among three types of executing projects including specialist contractors, general building contractor and government department. Methods : The target materials in this study were brick, cement, sand, steel, gravel and thermo-stone. SPSS V24. Descriptive and inferential analyses were applied in this study. Results and Discussion : Field observation show that the highest percentage of waste was “Brick” with 15.21% followed by “Sand” with 12.52% and “Thermo-stone” with 12.02%. The lowest percentage of waste in Iraq construction project was “Steel” and “Cement” with 3.96% and 4% respectively. The results of a comparison between these three groups confirmed that for all types of construction project waste, the governmental project had the highest percentage (12.77%), special contractor (11.19%), a general building contractor (9.71%). The major waste from materials was handling with 31.9%, concrete construction with 28.09% and 24.26% the finishing. Conclusion : The percentage of losses in the construction sites is very high compared to the permissible limit implementing inexpensive preventive measures, mostly related to managerial practice improvements.
topic construction material
construction waste
building
url https://www.jksee.or.kr/journal/view.php?number=4346
work_keys_str_mv AT alihussain evaluatingwastematerialamongconstructionprojectidentifyreasonwasteandsuggestionimprovementdesignercontractorandclientpractice
_version_ 1721280446860361728