Calculation the capacity of bucket wheel excavator the selective mining of overburden
During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal...
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mining and Geology, Belgrade
2020-01-01
|
Series: | Podzemni Radovi |
Subjects: | |
Online Access: | https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2020/0354-29042036019I.pdf |
id |
doaj-a1f01e4959774510a288ed0f7a7fc0b7 |
---|---|
record_format |
Article |
spelling |
doaj-a1f01e4959774510a288ed0f7a7fc0b72020-11-25T04:09:13ZengFaculty of Mining and Geology, BelgradePodzemni Radovi0354-29042560-33372020-01-0120203619280354-29042036019ICalculation the capacity of bucket wheel excavator the selective mining of overburdenIlić Saša0University of Belgrade, Faculty of Mining and Geology, SerbiaDuring open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping.https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2020/0354-29042036019I.pdfbucket wheel excavatorcapacityselective overburden miningopen pit mining |
collection |
DOAJ |
language |
English |
format |
Article |
sources |
DOAJ |
author |
Ilić Saša |
spellingShingle |
Ilić Saša Calculation the capacity of bucket wheel excavator the selective mining of overburden Podzemni Radovi bucket wheel excavator capacity selective overburden mining open pit mining |
author_facet |
Ilić Saša |
author_sort |
Ilić Saša |
title |
Calculation the capacity of bucket wheel excavator the selective mining of overburden |
title_short |
Calculation the capacity of bucket wheel excavator the selective mining of overburden |
title_full |
Calculation the capacity of bucket wheel excavator the selective mining of overburden |
title_fullStr |
Calculation the capacity of bucket wheel excavator the selective mining of overburden |
title_full_unstemmed |
Calculation the capacity of bucket wheel excavator the selective mining of overburden |
title_sort |
calculation the capacity of bucket wheel excavator the selective mining of overburden |
publisher |
Faculty of Mining and Geology, Belgrade |
series |
Podzemni Radovi |
issn |
0354-2904 2560-3337 |
publishDate |
2020-01-01 |
description |
During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping. |
topic |
bucket wheel excavator capacity selective overburden mining open pit mining |
url |
https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2020/0354-29042036019I.pdf |
work_keys_str_mv |
AT ilicsasa calculationthecapacityofbucketwheelexcavatortheselectiveminingofoverburden |
_version_ |
1724422859938332672 |