Calculation the capacity of bucket wheel excavator the selective mining of overburden

During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal...

Full description

Bibliographic Details
Main Author: Ilić Saša
Format: Article
Language:English
Published: Faculty of Mining and Geology, Belgrade 2020-01-01
Series:Podzemni Radovi
Subjects:
Online Access:https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2020/0354-29042036019I.pdf
id doaj-a1f01e4959774510a288ed0f7a7fc0b7
record_format Article
spelling doaj-a1f01e4959774510a288ed0f7a7fc0b72020-11-25T04:09:13ZengFaculty of Mining and Geology, BelgradePodzemni Radovi0354-29042560-33372020-01-0120203619280354-29042036019ICalculation the capacity of bucket wheel excavator the selective mining of overburdenIlić Saša0University of Belgrade, Faculty of Mining and Geology, SerbiaDuring open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping.https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2020/0354-29042036019I.pdfbucket wheel excavatorcapacityselective overburden miningopen pit mining
collection DOAJ
language English
format Article
sources DOAJ
author Ilić Saša
spellingShingle Ilić Saša
Calculation the capacity of bucket wheel excavator the selective mining of overburden
Podzemni Radovi
bucket wheel excavator
capacity
selective overburden mining
open pit mining
author_facet Ilić Saša
author_sort Ilić Saša
title Calculation the capacity of bucket wheel excavator the selective mining of overburden
title_short Calculation the capacity of bucket wheel excavator the selective mining of overburden
title_full Calculation the capacity of bucket wheel excavator the selective mining of overburden
title_fullStr Calculation the capacity of bucket wheel excavator the selective mining of overburden
title_full_unstemmed Calculation the capacity of bucket wheel excavator the selective mining of overburden
title_sort calculation the capacity of bucket wheel excavator the selective mining of overburden
publisher Faculty of Mining and Geology, Belgrade
series Podzemni Radovi
issn 0354-2904
2560-3337
publishDate 2020-01-01
description During open pit coal exploitation inevitably comes to land degradation. The negative changes, processes and consequences impose need for parallel working on sanitation and in general arranging destroyed natural areas. The one of sanitation criterion is implementation of reclamation which has a goal to restore completely or as much as it is possible, the destroyed area to its previous purpose. The priority has consistent conducting of technical reclamation of spoil in accordance with planned landscaping.
topic bucket wheel excavator
capacity
selective overburden mining
open pit mining
url https://scindeks-clanci.ceon.rs/data/pdf/0354-2904/2020/0354-29042036019I.pdf
work_keys_str_mv AT ilicsasa calculationthecapacityofbucketwheelexcavatortheselectiveminingofoverburden
_version_ 1724422859938332672