The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
Extensive research has been devoted to resource constrained project scheduling problem. However, little attention has been paid to problems where a certain time penalty must be incurred if activity preemption is allowed. In this paper, we consider the project scheduling problem of minimizing the tot...
Main Authors: | Behrouz Afshar nadjafi, Shahram Shadrokh |
---|---|
Format: | Article |
Language: | English |
Published: |
Islamic Azad University, Qazvin Branch
2010-02-01
|
Series: | Journal of Optimization in Industrial Engineering |
Subjects: | |
Online Access: | http://www.qjie.ir/article_14_846417eb65dd68706956fec9347821e7.pdf |
Similar Items
-
Minimizing Total Resource Tardiness Penalty Costs in the Resource Constrained Project Scheduling Problem with Metaheuristic Algorithms
by: R. Golestaneh, et al.
Published: (2013-09-01) -
EFFICIENT EXACT MINIMIZATION OF TOTAL TARDINESS IN TIGHT-TARDY PROGRESSIVE SINGLE MACHINE SCHEDULING WITH IDLING-FREE PREEMPTIONS OF EQUAL-LENGTH JOBS
by: Vadim V. Romanuke
Published: (2020-03-01) -
ACCURATE TOTAL WEIGHTED TARDINESS MINIMIZATION IN TIGHT-TARDY PROGRESSIVE SINGLE MACHINE SCHEDULING WITH PREEMPTIONS BY NO IDLE PERIODS
by: Vadim V. Romanuke
Published: (2019-10-01) -
Resource Constrained Project Scheduling Subject to Due Dates: Preemption Permitted with Penalty
by: Behrouz Afshar-Nadjafi
Published: (2014-01-01) -
Minimizing Total Completion Time For Preemptive Scheduling With Release Dates And Deadline Constraints
by: He Cheng, et al.
Published: (2014-02-01)