Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)

PT Abaisiat Raya is one of the manufacturers of rubber crumb (crumb rubber) in the city of Padang. Latex inventory management system at PT Abaisiat Kingdom basically signinfikan still need improvement. It is based on the planning activities in the warehouse inventory of raw materials firms irregular...

Full description

Bibliographic Details
Main Authors: Dina Rahmayanti, Ahmad Fauzan
Format: Article
Language:English
Published: Universitas Andalas 2016-04-01
Series:Jurnal Optimasi Sistem Industri
Online Access:http://josi.ft.unand.ac.id/index.php/josi/article/view/59
id doaj-a6aaeed5d43a4ecb9dfe93dcd4cd800a
record_format Article
spelling doaj-a6aaeed5d43a4ecb9dfe93dcd4cd800a2020-11-25T00:43:21ZengUniversitas AndalasJurnal Optimasi Sistem Industri2088-48422442-87952016-04-0112131732510.25077/josi.v12.n1.p317-325.201361Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)Dina Rahmayanti0Ahmad Fauzan1Jurusan Teknik Industri, Fakultas Teknik, Universitas Andalas, PadangJurusan Teknik Industri, Fakultas Teknik, Universitas Andalas, PadangPT Abaisiat Raya is one of the manufacturers of rubber crumb (crumb rubber) in the city of Padang. Latex inventory management system at PT Abaisiat Kingdom basically signinfikan still need improvement. It is based on the planning activities in the warehouse inventory of raw materials firms irregular, thus causing excess stock (over stock) at a time and shortage of stock (stock out) at other times. Process optimization is done with latex inventory system involving factors such as demand forecasting production planning or latex needs during the period of next 12 (in 2012), the costs involved, the waiting time (lead time), the implementation of forecasting methods, determination of size lots (lot sizing), the determination of safety stock (safety stock), and re-ordering time (reorder point), so the output will get a number of requests are for 12 periods ahead, the size of each reservation period, the total cost is required, when re-ordering will be done , as well as how much inventory to latex in the warehouse. Based on these results, it was found that the optimal size of the book is the same as the demand for each period (reservation is made each period) due to a cyclical pattern of demand and decreases throughout the planning period. Value of the stock or safety stock is located in Kg 114,282.20, and re-ordering time (reorder point) to cope with fluctuations do when the stock has reached a level of 333,130.95 kg. Keywords: Forecasting, Time Wait, Lot Size, Safety Supplies, Reorderhttp://josi.ft.unand.ac.id/index.php/josi/article/view/59
collection DOAJ
language English
format Article
sources DOAJ
author Dina Rahmayanti
Ahmad Fauzan
spellingShingle Dina Rahmayanti
Ahmad Fauzan
Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)
Jurnal Optimasi Sistem Industri
author_facet Dina Rahmayanti
Ahmad Fauzan
author_sort Dina Rahmayanti
title Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)
title_short Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)
title_full Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)
title_fullStr Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)
title_full_unstemmed Optimalisasi Sistem Persediaan Bahan Baku Karet Mentah (Lateks) dengan Metode Lot Sizing (Studi Kasus: PT Abaisiat Raya)
title_sort optimalisasi sistem persediaan bahan baku karet mentah (lateks) dengan metode lot sizing (studi kasus: pt abaisiat raya)
publisher Universitas Andalas
series Jurnal Optimasi Sistem Industri
issn 2088-4842
2442-8795
publishDate 2016-04-01
description PT Abaisiat Raya is one of the manufacturers of rubber crumb (crumb rubber) in the city of Padang. Latex inventory management system at PT Abaisiat Kingdom basically signinfikan still need improvement. It is based on the planning activities in the warehouse inventory of raw materials firms irregular, thus causing excess stock (over stock) at a time and shortage of stock (stock out) at other times. Process optimization is done with latex inventory system involving factors such as demand forecasting production planning or latex needs during the period of next 12 (in 2012), the costs involved, the waiting time (lead time), the implementation of forecasting methods, determination of size lots (lot sizing), the determination of safety stock (safety stock), and re-ordering time (reorder point), so the output will get a number of requests are for 12 periods ahead, the size of each reservation period, the total cost is required, when re-ordering will be done , as well as how much inventory to latex in the warehouse. Based on these results, it was found that the optimal size of the book is the same as the demand for each period (reservation is made each period) due to a cyclical pattern of demand and decreases throughout the planning period. Value of the stock or safety stock is located in Kg 114,282.20, and re-ordering time (reorder point) to cope with fluctuations do when the stock has reached a level of 333,130.95 kg. Keywords: Forecasting, Time Wait, Lot Size, Safety Supplies, Reorder
url http://josi.ft.unand.ac.id/index.php/josi/article/view/59
work_keys_str_mv AT dinarahmayanti optimalisasisistempersediaanbahanbakukaretmentahlateksdenganmetodelotsizingstudikasusptabaisiatraya
AT ahmadfauzan optimalisasisistempersediaanbahanbakukaretmentahlateksdenganmetodelotsizingstudikasusptabaisiatraya
_version_ 1725278880578666496