PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)

The maintenance system at PT Perkebunan Sentool Zidam V / Brawijaya is the maintenance of breakdowns. The syringe process suffers from engine failure and low maintenance inefficiencies. Increasing efficiency can be done by mapping the maintenance value flow (MVSM) and the Reliability Centered Mainte...

Full description

Bibliographic Details
Main Authors: Gray Miller Damanik, Siswoyo Soekarno, Ida Bagus Suryaningrat
Format: Article
Language:Indonesian
Published: Jurusan Teknik Pertanian Universitas Lampung 2020-12-01
Series:Jurnal Teknik Pertanian Lampung
Subjects:
rcm
sop
id doaj-a77d1b659d204ef5af467233473ed8bb
record_format Article
spelling doaj-a77d1b659d204ef5af467233473ed8bb2021-01-20T09:12:01ZindJurusan Teknik Pertanian Universitas LampungJurnal Teknik Pertanian Lampung2302-559X2549-08182020-12-0194287296http://dx.doi.org/10.23960/jtep-l.v9.i4.287-296PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER) Gray Miller Damanik0Siswoyo Soekarno1Ida Bagus Suryaningrat2Program Studi Teknologi Industri Pertanian, Fakultas Teknologi Pertanian, Universitas JemberProgram Studi Teknik Pertanian, Fakultas Teknologi Pertanian, Universitas JemberProgram Studi Teknologi Industri Pertanian, Fakultas Teknologi Pertanian, Universitas JemberThe maintenance system at PT Perkebunan Sentool Zidam V / Brawijaya is the maintenance of breakdowns. The syringe process suffers from engine failure and low maintenance inefficiencies. Increasing efficiency can be done by mapping the maintenance value flow (MVSM) and the Reliability Centered Maintenance (RCM) method. Activities using the RCM method formulate the optimal replacement schedule for the V-Belt component, namely 437.4 days (V-Belt delivers power to the drive), 527.386906 days (V-Belt delivers power to the finishing machine), 557.73 days (V-Belt delivery power to the crusher), 557.73 days (V-Belt transmitting power to the six in one engine), and 500.05 days (V-Belt transmitting power to the GT engine). The flow of engine maintenance using the MVSM method has a positive impact on the lag time for engine maintenance to be 36.43%. The results of this study provide several recommendations, namely the implementation of 5S, improvement of standard operating procedures (SOP), training and coaching of workers, and purchasing spare parts before the damage. correctivemvsmrcmsop
collection DOAJ
language Indonesian
format Article
sources DOAJ
author Gray Miller Damanik
Siswoyo Soekarno
Ida Bagus Suryaningrat
spellingShingle Gray Miller Damanik
Siswoyo Soekarno
Ida Bagus Suryaningrat
PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)
Jurnal Teknik Pertanian Lampung
corrective
mvsm
rcm
sop
author_facet Gray Miller Damanik
Siswoyo Soekarno
Ida Bagus Suryaningrat
author_sort Gray Miller Damanik
title PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)
title_short PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)
title_full PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)
title_fullStr PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)
title_full_unstemmed PERANCANGAN SISTEM PERAWATAN KOMPONEN V-BELT PADA SISTEM TRANSMISI DENGAN METODE RCM DAN MVSM (STUDI KASUS PT PERKEBUNAN SENTOOL ZIDAM V/BRAWIJAYA JEMBER)
title_sort perancangan sistem perawatan komponen v-belt pada sistem transmisi dengan metode rcm dan mvsm (studi kasus pt perkebunan sentool zidam v/brawijaya jember)
publisher Jurusan Teknik Pertanian Universitas Lampung
series Jurnal Teknik Pertanian Lampung
issn 2302-559X
2549-0818
publishDate 2020-12-01
description The maintenance system at PT Perkebunan Sentool Zidam V / Brawijaya is the maintenance of breakdowns. The syringe process suffers from engine failure and low maintenance inefficiencies. Increasing efficiency can be done by mapping the maintenance value flow (MVSM) and the Reliability Centered Maintenance (RCM) method. Activities using the RCM method formulate the optimal replacement schedule for the V-Belt component, namely 437.4 days (V-Belt delivers power to the drive), 527.386906 days (V-Belt delivers power to the finishing machine), 557.73 days (V-Belt delivery power to the crusher), 557.73 days (V-Belt transmitting power to the six in one engine), and 500.05 days (V-Belt transmitting power to the GT engine). The flow of engine maintenance using the MVSM method has a positive impact on the lag time for engine maintenance to be 36.43%. The results of this study provide several recommendations, namely the implementation of 5S, improvement of standard operating procedures (SOP), training and coaching of workers, and purchasing spare parts before the damage.
topic corrective
mvsm
rcm
sop
work_keys_str_mv AT graymillerdamanik perancangansistemperawatankomponenvbeltpadasistemtransmisidenganmetodercmdanmvsmstudikasusptperkebunansentoolzidamvbrawijayajember
AT siswoyosoekarno perancangansistemperawatankomponenvbeltpadasistemtransmisidenganmetodercmdanmvsmstudikasusptperkebunansentoolzidamvbrawijayajember
AT idabagussuryaningrat perancangansistemperawatankomponenvbeltpadasistemtransmisidenganmetodercmdanmvsmstudikasusptperkebunansentoolzidamvbrawijayajember
_version_ 1724331203413147648