Comparison Analysis Between Traditional and Long Segment Contracts on National Road Preservation Activities in Indonesia
National road preservation activities in Indonesia are usually carried out using a traditional approach system, namely in-house system and contract system with a design-bid-build (DBB) approach. An alternative contract method to improve the quality of roads is the long segment contract. Its definiti...
Main Authors: | R. P. Winanri, B. Susanti, I. Juliantina |
---|---|
Format: | Article |
Language: | English |
Published: |
D. G. Pylarinos
2019-06-01
|
Series: | Engineering, Technology & Applied Science Research |
Subjects: | |
Online Access: | https://etasr.com/index.php/ETASR/article/view/2720 |
Similar Items
-
LIFE CYCLE COST ANALYSIS OF A PBC PILOT PROJECT FOR ROAD IN INDONESIA
by: Betty Susanti, et al.
Published: (2019-12-01) -
SEGMENTATION AND QUALITY ANALYSIS OF LONG RANGE CAPTURED IRIS IMAGE
by: Anand Deshpande, et al.
Published: (2016-05-01) -
THE PERFORMANCE OF TRADITIONAL CONTRACT PROCUREMENT ON HOUSING PROJECTS IN NIGERIA
by: Aderemi Y Adeyemi, et al.
Published: (2006-01-01) -
PFSegIris: Precise and Fast Segmentation Algorithm for Multi-Source Heterogeneous Iris
by: Lin Dong, et al.
Published: (2021-08-01) -
To the issue of classification of contracts into consensual and real contracts
by: Сергій Ярославович Вавженчук
Published: (2020-03-01)