Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction

The formation of settlement troughs for the case when there are buildings above a tunnel is different from the case without buildings present on the ground surface during construction of shield tunnels below the ground. By considering the influence of building stiffness, previous studies have calc...

Full description

Bibliographic Details
Main Authors: Chun-lai Chen, Hao-qiang Yu, Gang Wei, Xiao Wang, Qi Ye
Format: Article
Language:English
Published: Eastern Macedonia and Thrace Institute of Technology 2015-04-01
Series:Journal of Engineering Science and Technology Review
Subjects:
Online Access:http://www.jestr.org/downloads/Volume8Issue3/fulltext83242015.pdf
id doaj-a96748937eac458fa21f87c3f8a68ef7
record_format Article
spelling doaj-a96748937eac458fa21f87c3f8a68ef72020-11-24T22:35:24ZengEastern Macedonia and Thrace Institute of TechnologyJournal of Engineering Science and Technology Review1791-23771791-23772015-04-0183179184Calculation of Building Foundation Settlement Caused by Shield Tunnel ConstructionChun-lai Chen0Hao-qiang Yu1Gang Wei2Xiao Wang3Qi Ye4Department of Civil Engineering, Zhejiang University City College, 310015, Hangzhou, ChinaDepartment of Civil Engineering, Zhejiang University City College, 310015, Hangzhou, ChinaDepartment of Civil Engineering, Zhejiang University City College, 310015, Hangzhou, ChinaCollege of Civil Engineering and Architecture, Zhejiang University, 310058, Hangzhou, ChinaPypun Engineering Consultants Ltd., Hong KongThe formation of settlement troughs for the case when there are buildings above a tunnel is different from the case without buildings present on the ground surface during construction of shield tunnels below the ground. By considering the influence of building stiffness, previous studies have calculated the surface of building subsidence during shield construction, but it was assumed that the soil around the tunnel would shrink evenly toward the center and that the focus should be fixed and the foundation stiffness of the building was not considered. The method used in this paper modifies the forward method, by considering a uniform ground movement model for shield tunnels and the foundation stiffness and depth. The calculated values are compared to the measured values, the values of the other method and also values obtained using finite-element simulation. The effects of the equivalent elastic modulus of buildings E1, the depth of the tunnel axis from the ground h and the distance between the tunnel axis L to the settlement of foundations are also analyzed. The results show that the values obtained by the present calculation method are more similar to the measured and finite-element simulation values than the values obtained using the other method. The settlement of foundations is found to decrease with increasing E1, h and L.http://www.jestr.org/downloads/Volume8Issue3/fulltext83242015.pdfshield tunnelbuildingfoundation settlementground loss
collection DOAJ
language English
format Article
sources DOAJ
author Chun-lai Chen
Hao-qiang Yu
Gang Wei
Xiao Wang
Qi Ye
spellingShingle Chun-lai Chen
Hao-qiang Yu
Gang Wei
Xiao Wang
Qi Ye
Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction
Journal of Engineering Science and Technology Review
shield tunnel
building
foundation settlement
ground loss
author_facet Chun-lai Chen
Hao-qiang Yu
Gang Wei
Xiao Wang
Qi Ye
author_sort Chun-lai Chen
title Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction
title_short Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction
title_full Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction
title_fullStr Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction
title_full_unstemmed Calculation of Building Foundation Settlement Caused by Shield Tunnel Construction
title_sort calculation of building foundation settlement caused by shield tunnel construction
publisher Eastern Macedonia and Thrace Institute of Technology
series Journal of Engineering Science and Technology Review
issn 1791-2377
1791-2377
publishDate 2015-04-01
description The formation of settlement troughs for the case when there are buildings above a tunnel is different from the case without buildings present on the ground surface during construction of shield tunnels below the ground. By considering the influence of building stiffness, previous studies have calculated the surface of building subsidence during shield construction, but it was assumed that the soil around the tunnel would shrink evenly toward the center and that the focus should be fixed and the foundation stiffness of the building was not considered. The method used in this paper modifies the forward method, by considering a uniform ground movement model for shield tunnels and the foundation stiffness and depth. The calculated values are compared to the measured values, the values of the other method and also values obtained using finite-element simulation. The effects of the equivalent elastic modulus of buildings E1, the depth of the tunnel axis from the ground h and the distance between the tunnel axis L to the settlement of foundations are also analyzed. The results show that the values obtained by the present calculation method are more similar to the measured and finite-element simulation values than the values obtained using the other method. The settlement of foundations is found to decrease with increasing E1, h and L.
topic shield tunnel
building
foundation settlement
ground loss
url http://www.jestr.org/downloads/Volume8Issue3/fulltext83242015.pdf
work_keys_str_mv AT chunlaichen calculationofbuildingfoundationsettlementcausedbyshieldtunnelconstruction
AT haoqiangyu calculationofbuildingfoundationsettlementcausedbyshieldtunnelconstruction
AT gangwei calculationofbuildingfoundationsettlementcausedbyshieldtunnelconstruction
AT xiaowang calculationofbuildingfoundationsettlementcausedbyshieldtunnelconstruction
AT qiye calculationofbuildingfoundationsettlementcausedbyshieldtunnelconstruction
_version_ 1725723492245045248