Tests Regarding the Transitory Regimes of Putting off Load of the Hydroagregate
For high power and high revolution aggregates it is required that the operation should take place in safe conditions, for all the running regimes. The most difficult regimes for a hydro aggregate are the transitory regimes. Although, these regimes generally last a rather short period of time, fo...
Main Authors: | Marcel Romulus Jurcu, Ioan Padureanu, Laurentiu Padeanu, Ladislau Augustinov, Cornel Hatiegan |
---|---|
Format: | Article |
Language: | English |
Published: |
Eftimie Murgu University of Resita
2015-09-01
|
Series: | Analele Universităţii "Eftimie Murgu" Reşiţa: Fascicola I, Inginerie |
Subjects: | |
Online Access: | http://anale-ing.uem.ro/2015/219.pdf |
Similar Items
-
Optimisation of the Start-up and Operation Regimes of Cooling Water Pumps of a High-Power Hydro Generator
by: Ioan Pădureanu, et al.
Published: (2015-07-01) -
Implementation of an Automatic System for the Monitoring of Start-up and Operating Regimes of the Cooling Water Installations of a Hydro Generator
by: Ioan Pădureanu, et al.
Published: (2015-07-01) -
STUDY OF MECHANICAL IMBALANCE AT A HYDRO-AGGREGATE WITH KAPLAN TURBINE
by: C. Haţiegan, et al.
Published: (2019-11-01) -
СИСТЕМНЫЕ ТРЕБОВАНИЯ К ЭФФЕКТИВНОСТИ ГИДРОЭЛЕКТРОСТАНЦИЙ
by: V. V. Radchenko
Published: (2018-09-01) -
The Evaluation of the Functional Performances for Microhydroaggregates Endowed with Asynchronous Generators by Vibrations Measurements
by: Valentin Nedelea, et al.
Published: (2013-09-01)