Optimal Re-Dispatching of Cascaded Hydropower Plants Using Quadratic Programming and Chance-Constrained Programming
Stochastic production from wind power plants imposes additional uncertainty in power system operation. It can cause problems in load and generation balancing in the power system and can also cause congestion in the transmission network. This paper deals with the problems of congestion in the transmi...
Main Authors: | Krešimir Fekete, Srete Nikolovski, Zvonimir Klaić, Ana Androjić |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2019-04-01
|
Series: | Energies |
Subjects: | |
Online Access: | https://www.mdpi.com/1996-1073/12/9/1604 |
Similar Items
-
On Efficient Semidefinite Relaxations for Quadratically Constrained Quadratic Programming
by: Ding, Yichuan
Published: (2007) -
On Efficient Semidefinite Relaxations for Quadratically Constrained Quadratic Programming
by: Ding, Yichuan
Published: (2007) -
Power System Day-Ahead Unit Commitment Based on Chance-Constrained Dependent Chance Goal Programming
by: Zhiwei Li, et al.
Published: (2018-07-01) -
Quadratically Constrained Quadratic Programming Formulation of Contingency Constrained Optimal Power Flow with Photovoltaic Generation
by: Luis M. Leon, et al.
Published: (2020-06-01) -
Chance-constrained optimal dispatch of integrated electricity and natural gas systems considering medium and long-term electricity transactions
by: Gang Wu, et al.
Published: (2019-09-01)