Probabilistic prediction of expected ground condition and construction time and costs in road tunnels
Ground condition and construction (excavation and support) time and costs are the key factors in decision-making during planning and design phases of a tunnel project. An innovative methodology for probabilistic estimation of ground condition and construction time and costs is proposed, which is an...
Main Authors: | A. Mahmoodzadeh, S. Zare |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2016-10-01
|
Series: | Journal of Rock Mechanics and Geotechnical Engineering |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1674775516301172 |
Similar Items
-
Model for estimation of time and cost based on risk evaluation applied on tunnel projects
by: Isaksson, Therese
Published: (2002) -
A probabilistic approach to soft ground tunneling.
by: Sluz, Andrew
Published: (2005) -
Optimizing Availability of a Framework in Series Configuration Utilizing Markov Model and Monte Carlo Simulation Techniques
by: Mansoor Ahmed Siddiqui, et al.
Published: (2017-06-01) -
Probabilistic Maintenance Cost Analysis for Aged Multi-Family Housing
by: Moonsun Park, et al.
Published: (2019-03-01) -
Predictability of well construction time with multivariate probabilistic approach
by: Quang-Hung LUU, et al.
Published: (2021-08-01)